🏭 Invitation For Bids: Construction And Commissioning Of Tube Well 🏭 Phed C.E. (Project),Jodhpur, A State Government Undertaking, Is Seeking Bids From Experienced Contractors For The Construction And Commissioning Of A 200 Mm Diameter Tube Well In Block Bapini, Including A Two Year Defect Liability Period. 📅 Bid Submission Deadline: July 10, 2024, 1:00 Pm Tender Fee: Inr 4000 Emd: Inr 500000 Interested Bidders Must Review The Detailed Tender Document As Per The Terms Of Reference (Td) And Submit Their Bids In Accordance With The Specified Guidelines And Timelines. Keywords: Construction, Tube Well, Commissioning, Phed, Project, Jodhpur, State Government, Ut, Bid, Emd, Tender Fee, Defect Liability Period
Particulars Details
Title
Construction And Commissioning Of 200 Mm Dia Tube Well Including Two Years Defect Liability Period In Block Bapini
Description
As Per Td
Organisation PHED - C.E. (Project),Jodhpur | State Govt. and UT
Tender Id 2024_PHCJO_394129_1
Reference
Number
SE/PHED/Distt. Cr./JU/27/2024-25
Tender Fee 4000
EMD 5 Lakh
Tender Value
Place Work
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=706528
Start Date June 13, 2024 18:30
End Date

10/07/2024 ( Expired 362 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Request for proposal (rfp) for selection of concessionaire for development of plug and play facilities under ppp mode in 50 acres on dbfot basis with a concession period of 45 years in sipcot panapakkam

Request for proposal (rfp) for selection of&amp#x0d concessionaire for development of plug and&amp#x0d play facilities under ppp mode in 50 acres on&amp#x0d dbfot basis with a concession period of 45 years in&amp#x0d sipcot panapakkam

Read more
Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Sewer rehabilitation of old and deteriorated pipes by trenchless cipp technology for main trunk sewer lines heading towards nandari and salawas stps with three year defect liability period

Read more
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and

Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines

Read more
Providing, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule)

Providing, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule) &amp#x0d &amp#x0d

Read more
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)

Read more
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.

Read more
I) design, architecture, engineering and construction of building for 110/11 kv gis substation, and (ii)design supply, installation and commissioning of 110/11kv gis substation in iit madras campus

I) design, architecture, engineering and construction of building for 110/11 kv gis substation, and (ii)design supply, installation and commissioning of 110/11kv gis substation in iit madras campus