Tender Details

Particulars Details
Title
Repair To Pothole And Long Stretches On Bahanga Talapada Road From 1/00 Km To 10/00 Km For The Year 2023 24
Description
Repair To Pothole And Long Stretches On Bahanga Talapada Road From 1/00 Km To 10/00 Km For The Year 2023 24
Organisation Government of Odisha
Tender Id 2023_EICCL_93657_3
Reference
Number
SE(RandB)BLS-Divn-1-43/2023-24
Tender Fee 6000
EMD 21200
Tender Value -
Place Superintending Engineer, Balasore(R and B)Divisio
Link
View Original Tender Notice

https://tendersodisha.gov.in

Start Date September 05, 2023 15:30
End Date
Expired 14/09/2023

Expired 1099 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n

Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.

Read more
Engaging of sweeping machine to carryout sweeping operations along the stretches pvnr express way and airport road upto ghmc limits. for the period of 1 year.

Engaging of sweeping machine to carryout sweeping operations along the stretches pvnr express way and airport road upto ghmc limits. for the period of 1 year.

Read more
Construction of high level bridges at km 0/8-10 km 4/0-2 km5/2-4 and km 5/4-6 repairs to the existing culverts/slab culverts on kasturpally-navalga road in vikarabad district

Construction of high level bridges at km 0/8-10 km 4/0-2 km5/2-4 and km 5/4-6 repairs to the existing culverts/slab culverts on kasturpally-navalga road in vikarabad district

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Construction of hlb at km 0/0-2 on gatlanarsingapur to kothakonda road in hanamkonda district

Construction of hlb at km 0/0-2 on gatlanarsingapur to kothakonda road in hanamkonda district

Read more
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Providing approaches to minor bridge at km 36/6-8 on achampet pwd road to akkaram via sidhapur in nagarkurnool district.

Providing approaches to minor bridge at km 36/6-8 on achampet pwd road to akkaram via sidhapur in nagarkurnool district.

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Repair to pothole and long stretches on salt from balasore to gud from 35.00 km to 39.00 km for the year 2023-24

Repair to pothole and long stretches on salt from balasore to gud from 35.00 km to 39.00 km for the year 2023-24

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise