Tender Details
Particulars | Details |
---|---|
Title |
Ie Services For Construction Of New Six Lane Access Controlled Capital Region Ring Road From Rameswar (Nh16) To Gobindpur Package Ii From Design Ch. Km. 40.700 To Km. 70.995 In The State Of Odisha Under Nh(o) On Hybrid Annuity Mode.
|
Description |
Ie Services For Construction Of New Six Lane Access Controlled Capital Region Ring Road From Rameswar (Nh16) To Gobindpur Package Ii From Design Ch. Km. 40.700 To Km. 70.995 In The State Of Odisha Under Nh(o) On Hybrid Annuity Mode.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | December 24, 2024 14:30 |
End Date |
19/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreUpgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreRehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreof your Industry type