Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Custom Bid For Services Amc For Thermal Conductivity Measurement Equipment And Amc For Thermal Ex
|
Description |
|
Organisation | Department of Defence Research & Development | Ministry of Defence |
Tender Id | GEM/2024/B/5570998 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | November 04, 2024 20:16 |
End Date |
26/11/2024 ( Expired 207 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Kothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of substation automation system (sas) scheme along with panel for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreTechnical assistance study for net work expansion, additional corridors and other improvement works / projects needed for mumbai suburban services for mutp-iv projects as per terms of
Technical assistance study for net work expansion, additional corridors and other improvement works / projects needed for mumbai suburban services for mutp-iv projects as per terms of
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreCustom bid for services - 3 years oem backed comprehensive amc of hpcc system and dc infra of rcc v
Read more
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConsultancy services for obtaining consent to operate (cto), preparation and submission of half yearly environment clearance (ec) compliance report for multi modal logistic park (mmlp) at jalna in the state of maharashtra
Consultancy services for obtaining consent to operate (cto), preparation and submission of half yearly environment clearance (ec) compliance report for multi modal logistic park (mmlp) at jalna in the state of maharashtra
Read moreHiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.
Read moreKothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of numerical bus bar protection relay scheme along with panels for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreof your Industry type