Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit I Ii Iii Attending Preventive Breakdown Works In Id Fans Airpreheater And Its Connected Ducts Of Unit I Ii Iii For The Period From 01 04 2024 To 31 03 2025
|
Description |
Ttps Mech Ii Bm Unit I Ii Iii Attending Preventive Breakdown Works In Id Fans Airpreheater And Its Connected Ducts Of Unit I Ii Iii For The Period From 01 04 2024 To 31 03 2025
|
Organisation | Government of Tamil Nadu |
Tender Id | 2024_EB_405910_1 |
Reference Number |
CE/TTPS/SE/M-II/No.40/2024-25 |
Tender Fee | 0 |
EMD | 23400 |
Tender Value | |
Place | O/o SE / M-II / TTPS |
Link | https://tntenders.gov.in |
Start Date | January 04, 2024 19:30 |
End Date |
22/01/2024 ( Expired 482 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Mtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Read moreProviding comprehensive maintenance and repairs for lift at zone-iii zonal office at asilmetta for 1year i.e from 01-04-2025 to 31-03-2026.
Providing comprehensive maintenance and repairs for lift at zone-iii zonal office at asilmetta for 1year i.e from 01-04-2025 to 31-03-2026.
Read moreNctps ii 2 x 600 mw operation circle chemical division time bound works operational and testing assistance to coal lab and quality checking of various chemicals for a period of 308 days from 28 05 2025 to 31 03 2026
Nctps ii 2 x 600 mw operation circle chemical division time bound works operational &#x0d and testing assistance to coal lab and quality checking of various chemicals for a period of 308 &#x0d days from 28 05 2025 to 31 03 2026&#x0d
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreEmandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Emandmrt- annual maintenance contract of 1768kgs ncl (numeric control logic) controller unit-ix boiler lift at ktps-v stage for the period from 01-07-2025 to 31-03-2026.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreCritical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Critical repair works and movement of locos dozers from railway marshaling yard to loco shed/maintenance pit/dozer shed/diesel bunk and back to railway marshalling yard /pile, coal yard in lem/chp/dr nttps during the period from 01/04/2025 or from the date of commencement of work to 31/03/2026.
Read moreOperation of works through contractor/external agency (from 01-04-2025 to 31-03-2026) under edd gairsain through outer agency against oandm head
Operation of works through contractor/external agency (from 01-04-2025 to 31-03-2026) under edd gairsain through outer agency against oandm head
Read moreSweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e., from 01-04-2025 to 31-03-2026. (with iala funds)
Sweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e. from 01-04-2025 to 31-03-2026. (with iala funds)
Read moreof your Industry type