Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Installation Off Grid Solar Photovoltaic (Pv) Power Plant Systems
|
| Description |
|
| Organisation | Agra | undefined |
| Tender Id | GEM/2023/B/3745241 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | July 26, 2023 21:17 |
| End Date |
Expired
16/08/2023
Expired 1153 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | CGS GREEN | Make : CGS Green Model : NA Title : Energy Audit | 16-08-2023 12:03:25 | MSE | Disqualified |
| 2 | M/S KISSAN IRON WORKS | Make : KISSAN SHAKTI Model : KS-01 Title : KISSAN SHAKTI 1 KVA SOLAR POWER PLANT | 11-08-2023 13:18:51 | MSE | Disqualified |
| 3 | SHAGUN ELECTRICAL | Make : UTL SOLAR SYSTEMS Model : off - grid solar photovoltaic (pv) power plant Title : off - grid solar photovoltaic (pv) power plant | 16-08-2023 13:47:57 | MSE | Qualified |
| 4 | SUDEEP ENGINEERS | Make : SUDEEP Model : 1 KVA Title : SOLAR OFF GRID SYSTEM | 08-08-2023 14:05:58 | MSE | Disqualified |
| 5 | WHITESHARK ENERGY PRIVATE LIMITED | Make : WHITESHARK Model : WEPL1KWPSPVOFFGRIDAGRA Title : WEPL 1KWP SPV OFFGRID AGRA | 14-08-2023 18:59:23 | MSE | Disqualified |
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Selection of solar power developers for setting up of 150 mw solar pv power projects with 75 mw/300 mwh energy storage systems (ess) in the state of bihar under tariff-based competitive bidding
Read moreImplementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism
Implementation of tentative of 50 mwp cumulative grid connected roof top solar pv systems under resco mode at various locations in the state of punjab with payment security mechanism
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 2.0 mld stp (ganoda road)
Read moreDesign, survey, supply, installation, testing, commissioning and 5 years comprehensive maintenance of distributed grid connected solar pv systems for solarisation of 200 nos. grid connected agricultural consumers in 03 nos. agricultural feeders.
Design, survey, supply, installation, testing, commissioning and 5 years comprehensive maintenance of distributed grid connected solar pv systems for solarisation of 200 nos. grid connected agricultural consumers in 03 nos. agricultural feeders.
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, near gopala goushala, sujangarh
Read moreSupply and installation of 6 nos. 25 kw solar powar plant off grid district- deoria
Supply and installation of 6 nos. 25 kw solar powar plant off grid district- deoria
Read moreTwo year maintenance contract for ppc system installed at 20 mw solar pv plant and 9 mvar capacitor bank at ntpc jhanor
Two year maintenance contract for ppc system installed at 20 mw solar pv plant and 9 mvar capacitor bank at ntpc jhanorsystemcommissioned by m s emerson automation solutions for 20 mw solar pvplant and 9 mvar capacitor bank at ntpc jhanor gandhar
Read moreOff gas heater
Procurement of material, fabrication, testing and supply of ss304l off gas electric heater along with heating coil and control panel as per technical specification
Read moreProvn of roof top 20 kw solar power plant off grid with battery backup for mdc agra under ge (east) agra
Provn of roof top 20 kw solar power plant off grid with battery backup for mdc agra under ge (east) agra
Read moreProposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Proposed for solar pv plant of 100 kwp 3 phase on grid solar rooftop/ground mounted at 1.5 mld stp, pipe line for supply treated water at stp 1.5 mld, near gopala goushala, sujangarh unit-ii
Read moreof your Industry type