Tender Details

Particulars Details
Title
Labour Contract For Replacement Of Pan No. 3 Tapper Cone, Pan No. 5,6 Save All Outer Shell Work
Description
Labour Contract For Replacement Of Pan No. 3 Tapper Cone, Pan No. 5,6 Save All Outer Shell Work
Organisation Department of Sugar | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 1000
Tender Value
Place Padalam
Link

AAAAAAAAAA

Login to view
Start Date June 10, 2025 18:40
End Date

17/06/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract

Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract

Read more
Biennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps

Biennial contract for coal mill rejection and assistance in misc jobs of operation department including equipment cleaning for all units btps

Read more
Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..

Three-year comprehensive annual maintenance contract (camc) for environmental control system (electrical, mechanical, water treatment plant and ro plant, excluding bms system) for 13 underground metro stations of l-2 and l-3 , and three-year..

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3

Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3

Read more
Maintenance work of baijataal and motimahal parisar ward no.58 zone no.13.file no.120/25x3/3.

Maintenance work of baijataal and motimahal parisar ward no.58 zone no.13.file no.120/25x3/3.

Read more
Replacement of acsr panther conductor alongwith all hardware,accessories and disc insulators for 132kv nimbahera -choti sadri -barawarda -pratagarh line (69.4kms) (exculding lilo section of 132kvgss barawarda) under bn-9015002505

Replacement of acsr panther conductor alongwith all hardware,accessories and disc insulators for 132kv nimbahera -choti sadri -barawarda -pratagarh line (69.4kms) (exculding lilo section of 132kvgss barawarda) under bn-9015002505

Read more
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise