Tender Details
Particulars | Details |
---|---|
Title |
Re Handling Of Spilled Coal/Slime From Surrounding Areas Of Unit No. 121 A And B Belt Conveyor Of Main Plant Of Kedla Washery
|
Description |
Re Handling Of Spilled Coal/Slime From Surrounding Areas Of Unit No. 121 A And B Belt Conveyor Of Main Plant Of Kedla Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_327143_1 |
Reference Number |
PO/KW/E-TENDER/24-25/111, Date-28/01/2025 |
Tender Fee | 0 |
EMD | 2800 |
Tender Value | |
Place | kedla washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339087 |
Start Date | January 29, 2025 15:30 |
End Date |
08/02/2025 ( Expired 74 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cleaning of coal handling plant btps and cleaning of unloaded coal wagon through tippler and shifting of coal to atps coal yard / btps wagon tippler and manual unloading of coal from derailed loaded wagons and shifting of unloaded coal to the coal ya
Cleaning of coal handling plant btps and cleaning of unloaded coal wagon through tippler and shifting of coal to atps coal yard / btps wagon tippler and manual unloading of coal from derailed loaded wagons and shifting of unloaded coal to the coal ya
Read moreCarriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreAnnual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Annual contract for routine operation in shift and r/c/b maintenance work of 6.6 kv swgr of main plant area, maintenance of spbd, cable laying and termination work, o and m of lift and elevators of unit- i to iv, ctpp chhabra.
Read moreDismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Dismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Read moreWork of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl
Work of providing &#x0d consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal &#x0d mines of wcl withing 40 km to stps, mppgcl
Read moreRoutine water supply and sanitary maintenance work including replacement of arterial main potable water supply line at various location of plant from unit 1 n 8 at mtps, dvc
Routine water supply and sanitary maintenance work including replacement of arterial main potable water supply line at various location of plant from unit 1 n 8 at mtps, dvc
Read moreSprinkling of water to the roads from piyala gate along coal movement road, part of chp area to technical building, to silos of unit nos. 7 and 8 and up to construction gate.job no. 923 /dpps.
Sprinkling of water to the roads from piyala gate along coal movement road, part of chp area to technical building, to silos of unit nos. 7 and 8 and up to construction gate.job no. 923 /dpps.
Read moreRe-carpeting of existing bituminous road ing from institute main gate to substation-ii, back side of hostel no. 8 via hostel no. 4 and substation ii to kv school road at nit silchar
Re-carpeting of existing bituminous road ing from institute main gate to substation-ii, back side of hostel no. 8 via hostel no. 4 and substation ii to kv school road at nit silchar
Read moreConstruction work of interlocking tiles in the street and surrounding areas from plot no. 148 to plot no. 246, 147-c and c-15 in shiv puri ii, ward no. 11.
Construction work of interlocking tiles in the street and surrounding areas from plot no. 148 to plot no. 246, 147-c and c-15 in shiv puri ii, ward no. 11.
Read moreWork contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Work contract for operation and maintenance along with housekeeping of coal handling plant of chp-i and manual unloading of coal from coal rake at track hopper for 2x600 mw, phase-i, sstpp, mppgcl, dongalia, for the period of 2 years (24 months)
Read moreof your Industry type