Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bifurcation Of Existing 11 Kv Vasavishiva Sai Nagar Feeder
|
Description |
Bifurcation Of Existing 11 Kv Vasavishiva Sai Nagar Feeder Emanating From 33/11 Kv Nn Colony Ss By Erecting 2.05 Km New 11 Kv Line (1.60 Km Ab Cable Oh Line 0.450 Km Of 11 Kv Ug Cable) On Existing Towers, Poles And On Now Proposed 9.1mts And 11mts Pscc Poles Along With Bay Extension And Erection Of 1 No. 11 Kv Feeder Vcb At 33/11 Kv Nn Colony Ss In Cherlapally Ida Ii Section Of Cherlapally Sub Division Of Sainikpuri Division In Habsiguda Circle Under T And D Improvements To Original Works Under Summer Action Plan 2024 2025(reserved For Sc)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 567211 |
Reference Number |
CE/OP/Medchal Zone -27/24-25 |
Tender Fee | 516 |
EMD | 29152 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | January 09, 2025 01:00 |
End Date |
21/01/2025 ( Expired 144 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreJp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreModification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Modification/shifting work of 400/220/132 kv lines, restoration of supply in case of collapsed/damaged tower, replacement of tower, stub repairing, resgaging of conductor, replacement of disc insulator etc. in central zone in mp on rate contract
Read moreTower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)
Read moreTower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line
Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 132 kv harda-seoni malwa and 132 kv itarsi-seoni malwa line under tlm sub dn. harda under ee (eht-maint.) dn itarsi.
Read moreDesign and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Design and construction of 
 property development buildings in land parcels at existing mandaveli bus 
 depot and terminus including civil, architectural finishes, plumbing, e and m, 
 hvac, lifts and all associated works
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreof your Industry type