Tender Details

Particulars Details
Title
Mmnppna 23 24 65 (I) Construction Of Steamer Ghat Road Road Side Drain (From Ch 0.00 M To Ch 365.00 M), (Ii) Construction Of Rcc Covered Road Side Drain On Sonarpatty Road No.2, (Iii) Construction Of Rcc Covered Road Side Drain On Vivekanda Road,
Description
Mmnppna 23 24 65 (I) Construction Of Steamer Ghat Road Road Side Drain (From Ch 0.00 M To Ch 365.00 M), (Ii) Construction Of Rcc Covered Road Side Drain On Sonarpatty Road No.2, (Iii) Construction Of Rcc Covered Road Side Drain On Vivekanda Road,
Organisation Government of Assam
Tender Id 2023_PWD_32684_69
Reference
Number
CE/DEV/TB/08/2023-24/14
Tender Fee 5410
EMD 5.41 Lakh
Tender Value
Place O/o the Chief Engineer Roads, PWRD, Assam
Link
View Original Tender Notice

https://assamtenders.gov.in

Start Date October 10, 2023 19:30
End Date
Expired 17/10/2023

Expired 1008 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Mmnppna_23_24_57 (1) construction of rcc covered drain at dcb road (balanced portion), (2) construction of khoragorah road - (i) upgradation from ch 0.00 m to ch.200 m, (ii) re-construction from ch.400 to ch. 610m and (iii) new construction from ch.

Mmnppna_23_24_57 (1) construction of rcc covered drain at dcb road (balanced portion), (2) construction of khoragorah road - (i) upgradation from ch 0.00 m to ch.200 m, (ii) re-construction from ch.400 to ch. 610m and (iii) new construction from ch.

Read more
Mmnppna_23_24_57 (1) construction of rcc covered drain at dcb road (balanced portion), (2) construction of khoragorah road - (i) upgradation from ch 0.00 m to ch.200 m, (ii) re-construction from ch.400 to ch. 610m and (iii) new construction from ch.

Mmnppna_23_24_57 (1) construction of rcc covered drain at dcb road (balanced portion), (2) construction of khoragorah road - (i) upgradation from ch 0.00 m to ch.200 m, (ii) re-construction from ch.400 to ch. 610m and (iii) new construction from ch.

Read more
Mmnppna_23_24_89 (i) construction of rcc drain outlet from rrb road to kollong, (ii) reconstruction and widening of rabin bordoloi road (ch-0.00 m to ch-330.00 m), (iii) construction of namghar road bye-lane i (ch-0.00 m to ch-65.00 m),bye lane 2 (ch

Mmnppna_23_24_89 (i) construction of rcc drain outlet from rrb road to kollong, (ii) reconstruction and widening of rabin bordoloi road (ch-0.00 m to ch-330.00 m), (iii) construction of namghar road bye-lane i (ch-0.00 m to ch-65.00 m),bye lane 2 (ch

Read more
Mmnppna_23_24_76 (i)construction of bhebarghat smashan approach road, ward no.10 ( ch. 0.00 m to ch. 205.00m ), (ii) construction of denial path at ward no.2 including one side drain ( ch. 0.00 m to ch. 306.00m ), (iii) construction of bye lane from

Mmnppna_23_24_76 (i)construction of bhebarghat smashan approach road, ward no.10 ( ch. 0.00 m to ch. 205.00m ), (ii) construction of denial path at ward no.2 including one side drain ( ch. 0.00 m to ch. 306.00m ), (iii) construction of bye lane from

Read more
Mmnppna_23_24_53 (i) construction of fci road from pachali masjid road to fci campus gate no.2 (from ch. 0.00 m to ch. 500.00 m) with both side rcc covered drain (ii) widening of sati joymoti road from hojai circle office to gopal nagar culvert with

Mmnppna_23_24_53 (i) construction of fci road from pachali masjid road to fci campus gate no.2 (from ch. 0.00 m to ch. 500.00 m) with both side rcc covered drain (ii) widening of sati joymoti road from hojai circle office to gopal nagar culvert with

Read more
Mmnppna_23_24_53 (i) construction of fci road from pachali masjid road to fci campus gate no.2 (from ch. 0.00 m to ch. 500.00 m) with both side rcc covered drain (ii) widening of sati joymoti road from hojai circle office to gopal nagar culvert with

Mmnppna_23_24_53 (i) construction of fci road from pachali masjid road to fci campus gate no.2 (from ch. 0.00 m to ch. 500.00 m) with both side rcc covered drain (ii) widening of sati joymoti road from hojai circle office to gopal nagar culvert with

Read more
Mmnppna_23_24_86 (i) construction of rcc drain at paruj bora road(sechabat), (ii) construction of choukat ali road including both side drain (ch-0.00 m to ch-140.00 m), (iii) construction of drain by the side of r.d.m. road including culvert, (iv)

Mmnppna_23_24_86 (i) construction of rcc drain at paruj bora road(sechabat), (ii) construction of choukat ali road including both side drain (ch-0.00 m to ch-140.00 m), (iii) construction of drain by the side of r.d.m. road including culvert, (iv)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise