Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Components Of Waste To Compost (W2 C) And Material Recovery Facility (Mrf) Plant Under Swachh Bharat Mission (Sbm U 2.0) With 15th Fc Tied Grant
|
Description |
Construction Of Components Of Waste To Compost (W2 C) And Material Recovery Facility (Mrf) Plant Under Swachh Bharat Mission (Sbm U 2.0) With 15th Fc Tied Grant
|
Organisation | Urban Development Department | State Govt. and UT |
Tender Id | 2025_UDD_44032_1 |
Reference Number |
NIT.NO.SMB/SBM-U and 15thFC/2025-26/29 dt.08.04.2025 |
Tender Fee | 5000 |
EMD | 2.08 Lakh |
Tender Value | |
Place | Sapatgram, Ward No.8 |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=70213 |
Start Date | April 08, 2025 20:00 |
End Date |
30/04/2025 ( Expired 12 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of material recovery facility (mrf) and faecal sludge treatment plant (fstp) in municipal council betul
Construction of material recovery facility (mrf) and faecal sludge treatment plant (fstp) in municipal council betul
Read moreConstruction of compost plant under swachha bharat mission 2.0. municipal council daboh distt. bhind
Construction of compost plant under swachha bharat mission 2.0. municipal council daboh distt. bhind
Read moreConstruction/strengthening work of mrf/composting plant under swachh bharat mission 2.0
Construction/strengthening work of mrf/composting plant under swachh bharat mission 2.0
Read moreIn gram chhidya plari n.p.p.seoni trenching ground construction/ strengthening work of mrf/composting plant under sbm 2.0 dry waste receiving platform, wet waste receiving platform, reject platform, window platform, toilet, office building, etc
In gram chhidya plari n.p.p.seoni trenching ground construction/ strengthening work of mrf/composting plant under sbm 2.0 dry waste receiving platform, wet waste receiving platform, reject platform, window platform, toilet, office building, etc
Read moreConstruction of proposed mrf material recovery facility on gata no 549-0.444 hec and gata no- 556-0.592 hect in village sahasrawan at nagar panchayat payagpur
Construction of proposed mrf material recovery facility on gata no 549-0.444 hec and gata no- 556-0.592 hect in village sahasrawan at nagar panchayat payagpur
Read moreConstruction of concrete drain from roll hat tala to bakul tala within roall gp, under indas block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-52 of 2024-25,sl. no. 3)
Construction of concrete drain from roll hat tala to bakul tala within roall gp, under indas block under 15th fc tied fund (2025-26) under bankura zilla parishad.(2nd call of nit-52 of 2024-25,sl. no. 3)
Read moreConstruction of proposed 30 tpd municipal waste processing plant...boundary wall other ancillary works and construction of internal roads, drains ...under swatch bharat mission within budge budge municipality
Construction of proposed 30 tpd municipal waste processing plant...boundary wall other ancillary works and construction of internal roads, drains ...under swatch bharat mission within budge budge municipality
Read moreEoi for development of stp under sbm (u) 2.0 maharashtra
Expression of interest (eoi) invited for selection and empanelment of agency for development of sewage treatment plants (stps) on epc basis in 358 urban local bos (below 1 lakh population) in maharashtra under swachh bharat mission &#x0d (u) 2.0
Read moreConstruction of c.c road with drainage system and r/wall from the h.o sri pichon sarkar to h.o subhash das at s.d mission under ward no 38 amc.
Construction of c.c road with drainage system and r/wall from the h.o sri pichon sarkar to h.o subhash das at s.d mission under ward no 38 amc.
Read moreConstruction of mini csc in 219 middle school agaram village in agaram panchayat in chithamur block under sbm general fund and 15th fc tied and untied scheme for the year 2025-26
Construction of mini csc in 219 middle school agaram village in agaram panchayat in chithamur block under sbm general fund and 15th fc tied and untied scheme for the year 2025-26
Read moreof your Industry type