Tender Details

Particulars Details
Title
Replacement Of Pa Fan Airline, Bends, Compensator, Straight Pipe Line, Reducer, Flange Etc. From Pa Fans To Ball Mills Of Cpp Boilers 02 Units.
Description
Replacement Of Pa Fan Airline, Bends, Compensator, Straight Pipe Line, Reducer, Flange Etc. From Pa Fans To Ball Mills Of Cpp Boilers 02 Units.
Organisation Bokaro Power Supply Company (P) Limited | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 0
Tender Value
Place Power Plant, BPSCL, Bokaro Steel City
Link

AAAAAAAAAA

Login to view
Start Date April 03, 2025 20:00
End Date

21/04/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of ms pipe line 200 mm dia. from river bed pump to chp of hloc mine , hlsa including soil excavation and replacement of damaged pipe.

Repairing of ms pipe line 200 mm dia. from river bed pump to&#x0d chp of hloc mine , hlsa including soil excavation and&#x0d replacement of damaged pipe.

Read more
Replacement of pa fan airline, bends, compensator, straight pipe-line, reducer, flange etc. from pa fans to ball mills of cpp boilers-02 units.

Replacement of pa fan airline, bends, compensator, straight pipe-line, reducer, flange etc. from pa fans to ball mills of cpp boilers-02 units.

Read more
Up-keeping of auxiliary equipment like ball mill gearboxes, pa fan, id fans, fd fans bearing pedestals and removal of jamming from inside chamber of ball mill and rc feeder of cpp boilers.

Up-keeping of auxiliary equipment like ball mill gearboxes, pa fan, id fans, fd fans bearing pedestals and removal of jamming from inside chamber of ball mill and rc feeder of cpp boilers

Read more
Replacement of damaged and rusted g.i. main and distribution pipe line with ppr pipes from municipal oht to livestock farm complex at dollygunj under cd-i,a.p.w.d port blair

Replacement of damaged and rusted g.i. main and distribution pipe line with ppr pipes from municipal oht to livestock farm complex at dollygunj under cd-i,a.p.w.d port blair

Read more
Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Read more
Deposit-museum and zoo-maintenance of drainage mots in various enclosure in zoo and new pipe line works for conveying the sewage from the open pond where sloth bear himalayan bear etc are kept to the drain at the bottom of tiger cage-civil work

Deposit-museum and zoo-maintenance of drainage mots in various enclosure in zoo and new pipe line works for conveying the sewage from the open pond where sloth bear himalayan bear etc are kept to the drain at the bottom of tiger cage-civil work

Read more
Replacement of old pipe line with new pipe line from nahar chowk to charkhi gate in ward no 31 under kaulagarh zone

Replacement of old pipe line with new pipe line from nahar chowk to charkhi gate in ward no 31 under kaulagarh zone

Read more
State plan 2024 25 twss replacement of old and damaged pipe 400mm premo pipe line from pattom marappalam to pattom junction with 400 mm di pipe

State plan 2024 25 twss replacement of old and damaged pipe 400mm premo pipe line from pattom marappalam to pattom junction with 400 mm di pipe

Read more
Replacement of old pipe line with new pipe line from nahar chowk to charkhi gate in ward no 31 under kaulagarh zone

Replacement of old pipe line with new pipe line from nahar chowk to charkhi gate in ward no 31 under kaulagarh zone

Read more
Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Di/relocation of 11 kv and 440 v o/h line passing nearby w.b no. -01, 02, 03, 04 and wash coal stock yard due to non- maintaining of minimum safety clearance from 33 kv solar power o/h line under chp-cpp/ppr. on urgent basis before charging th

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise