🏭 Bokaro Power Supply Company (P) Limited Rfp For Compensator Replacement 🛠️ Bokaro Power Supply Company (P) Limited, A Public Sector Undertaking, Is Issuing A Request For Proposal (Rfp) For The Replacement Of Various Compensators In The Airline And Flue Gas Ducts Of Cpp Boilers 6, 7, And 8. 🏭 📅 Proposal Submission Deadline: July 11, 2024, 11:00 Am Interested Vendors Must Provide Detailed Technical And Financial Proposals For The Supply And Installation Of The Compensators. 📑 Keywords: Compensator Replacement, Cpp Boilers, Power Plant, Bokaro Steel City, Bpscl, Public Sector Undertaking, Rfp, Industrial Equipment| Particulars | Details |
|---|---|
| Title |
Replacement Of Different Compensators In Airline And Flue Gas Duct Of Cpp Boilers 6, 7 And 8.
|
| Description |
Replacement Of Different Compensators In Airline And Flue Gas Duct Of Cpp Boilers 6, 7 And 8.
|
| Organisation | Bokaro Power Supply Company (P) Limited | Public Sector Undertakings |
| Tender Id | 2024_BPSCL_199160_1 |
|
Reference Number |
24-25/C-055/LTE-023 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Power Plant, BPSCL,Bokaro Steel City |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218023 |
| Start Date | June 24, 2024 15:00 |
| End Date |
Expired
11/07/2024
Expired 787 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement or repair of air duct and flue gas duct of k530, k531, k532 and sub in cpp, petro-uc.
Replacement or repair of air duct and flue gas duct of k530, k531, k532 and sub in cpp, petro-uc.
Read moreStrengthening of cpp boilers (6, 7 and 8) and auxiliaries for supervisory control.
Strengthening of cpp boilers (6, 7 and 8) and auxiliaries for supervisory control.
Read moreStrengthening of cpp boilers (6, 7 and 8) and auxiliaries for supervisory control.
Strengthening of cpp boilers (6, 7 and 8) and auxiliaries for supervisory control.
Read moreReplacement of hot air and flue gas ducts replacement in sgp boilers
Replacement of hot air and flue gas ducts replacement in sgp boilers
Read moreReplacement of pa fan airline, bends, compensator, straight pipe-line, reducer, flange etc. from pa fans to ball mills of cpp boilers-02 units.
Replacement of pa fan airline, bends, compensator, straight pipe-line, reducer, flange etc. from pa fans to ball mills of cpp boilers-02 units.
Read moreFabrication of different mechanical components as per sample for cpp boilers.
Fabrication of different mechanical components as per sample for cpp boilers.
Read moreRepair replacement of pipe lines for fly ash silo system for cpp boilers 6 and 7
Repair replacement of pipe lines for fly ash silo system for cpp boilers 6 and 7
Read moreFabrication of different mechanical spares as per sample for tpp boilers, cpp boilers and boiler 9
Fabrication of different mechanical spares as per sample for tpp boilers, cpp 
 boilers and boiler 9
Read moreFabrication of different mechanical spares as per sample for tpp boilers, cpp boilers and boiler 9.
Fabrication of different mechanical spares as per sample for tpp boilers, cpp boilers and boiler 9.
Read moreAssistance in operational activity of cpp boilers 6, 7 and 8 for equipments installed at zero meters.
Assistance in operational activity of cpp boilers 6, 7 and 8 for equipments installed at zero meters.
Read moreof your Industry type