Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Conducting The Yield Test Of 75 Nos Tubewell By Operating The Pumping Continuously For A Desired Time Period And Measuring The Discharge And Drawdown Of Tubewell At A Suitable Time Interval In Different Villages Of Sub Division Pichhore, Dist Svp
|
| Description |
Conducting The Yield Test Of 75 Nos Tubewell By Operating The Pumping Continuously For A Desired Time Period And Measuring The Discharge And Drawdown Of Tubewell At A Suitable Time Interval In Different Villages Of Sub Division Pichhore, Dist Svp
|
| Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
| Tender Id | 2026_PHED_473308_1 |
|
Reference Number |
159/EE/PHED/2025-26/SVP |
| Tender Fee | 2295 |
| EMD | 32780 |
| Tender Value | |
| Place | Sub Division Pichhore |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=557778 |
| Start Date | January 13, 2026 16:00 |
| End Date |
Expired
27/01/2026
Expired 137 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Conducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division karera, dist svp.
Conducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division karera, dist svp.
Read moreConducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division shivpuri, district
Conducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division shivpuri, district
Read moreConducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division kolaras, district
Conducting the yield test of 75 nos tubewell by operating the pumping continuously for a desired time period and measuring the discharge and drawdown of tubewell at a suitable time interval in different villages of sub division kolaras, district
Read moreConducting the yield test of tube well sources of pwss by pumping continuously for 24 hours in various villages at distt. datia
Conducting the yield test of tube well sources of pwss by pumping continuously for 24 hours in various villages at distt. datia
Read moreConducting yield test of 200/150 mm dia tubewell in different villages of block ujjain (150 nos)
Conducting yield test of 200/150 mm dia tubewell in different villages of block ujjain (150 nos)
Read moreHydrofracturing of 75 nos. tube wells to increase the yield of existing tube well in different villages of block mauganj, distt. mauganj (m.p.)
Hydrofracturing of 75 nos. tube wells to increase the yield of existing tube well in different villages of block mauganj, distt. mauganj (m.p.)
Read more113/23-24 work of various rwss to provide fhtcs including one year defect liability period of 01 schemes (2 villages) by solar powered bore well pumping system under jjm in the jurisdiction of phed division karauli distt. karauli
Work of various rwss to provide fhtcs including one year defect liability period of 01 schemes (2 villages) by solar powered bore well pumping system under jjm in the jurisdiction of phed division karauli distt. karauli
Read more114/23-24work of various rwss to provide fhtcs including one year defect liability period of 01 schemes (52 villages) by solar powered bore well pumping system under jjm in the jurisdiction of phed division karauli distt. karauli
Work of various rwss to provide fhtcs including one year defect liability period of 01 schemes (52 villages) by solar powered bore well pumping system under jjm in the jurisdiction of phed division karauli distt. karauli
Read moreof your Industry type