Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Real Time Online Continuous Discharge/Flow Measurement System,Installation And Commissioning Of Flo
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/B/6610122 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 26, 2025 17:09 |
| End Date |
Expired
16/09/2025
Expired 390 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Comprehensive annual maintenance contract (amc), annual technical support (ats), cloud hosting, connectivity and real time operational support for the automated system balancing mechanism (asbm) and maintenance of hardware installed at state load dispatch centre (sldc) and associated 16 grid sub-stations (gss) for 5 years against nit no. 37/pr/bsptcl/2026.
Read moreSupply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Supply, installation and cmc of online water quality monitoring system in mine discharge water at ik-1a incline and srpocp, srp area. cmc is for a period of 3 years for ik-1a inc and 2 years for srpocp respectively after completion of two years warranty period, as per the technical specifications, terms and conditions of nit document.
Read moreDiversion of water for e-flow along with real time continuous flow measurement and data logging device on rana khad for uhl stage-iii (100 mw)
Diversion of water for e-flow along with real time continuous flow measurement and data logging device on rana khad for uhl stage-iii (100 mw)
Read moreof your Industry type