Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Monthly Basis Cab & Taxi Hiring Services Suv; 1500 X 480 Hours; Local,Monthly Basis Cab & Taxi Hi
|
| Description |
|
| Organisation | Airports Authority of India (AAI) | Ministry of Civil Aviation |
| Tender Id | GEM/2023/B/3977712 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 20, 2023 16:20 |
| End Date |
Expired
03/10/2023
Expired 1104 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
KAPIL TRAVELS & TRANSPORT
7080000
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | Status |
|---|---|---|---|---|
| 1 | JYOTI ENTERPRISES | 03-10-2023 18:26:34 | MSE | Disqualified |
| 2 | KAPIL TRAVELS & TRANSPORT | 02-10-2023 17:38:03 | Registered with designated Agency / Authority | Qualified |
| 3 | MUDGAL CORPORATE SERVICES (OPC) PRIVATE LIMITED | 03-10-2023 18:15:20 | Start-up | Qualified |
| 4 | NAYAN TOUR AND TRAVEL | 30-09-2023 12:04:53 | KVIC | Disqualified |
| 5 | OM SALES & SERVICES | 03-10-2023 19:28:01 | MSE | Disqualified |
| 6 | POOJA BUILDCON CONSTRUCTION | 03-10-2023 16:09:18 | MSE | Qualified |
| 7 | S.P.SHELAR AND CO (PROP. SHELAR S P) | 03-10-2023 16:35:18 | Registered with designated Agency / Authority | Disqualified |
| 8 | SHREE GOSAI ENTERPRISES | 03-10-2023 09:43:42 | MSE | Disqualified |
| 9 | SIGMA INFOTECH | 03-10-2023 19:43:15 | Registered with designated Agency / Authority | Disqualified |
| 10 | SWAN CONTINENTAL | 03-10-2023 13:48:27 | Registered with designated Agency / Authority | Qualified |
| 11 | V.I.P. SERVICES | 03-10-2023 14:57:53 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | KAPIL TRAVELS & TRANSPORT | Item Categories : Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local,Monthly Basis Cab & Taxi Hi | 7080000.00 | L1 |
| 2 | V.I.P. SERVICES( MSE Social Category:General ) | Item Categories : Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local,Monthly Basis Cab & Taxi Hi | 7555428.48 | L2 |
| 3 | MUDGAL CORPORATE SERVICES (OPC) PRIVATE LIMITED | Item Categories : Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local,Monthly Basis Cab & Taxi Hi | 7560000.00 | L3 |
| 4 | SWAN CONTINENTAL | Item Categories : Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local,Monthly Basis Cab & Taxi Hi | 7849699.20 | L4 |
| 5 | POOJA BUILDCON CONSTRUCTION( MSE Social Category:General ) | Item Categories : Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local,Monthly Basis Cab & Taxi Hi | 8769600.00 | L5 |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Monthly Basis Cab & Taxi Hiring Services - SUV; 1500 x 480 hours; Local | Monthly Basis Cab & Taxi Hiring Services | 1 | ₹ 1680000.000 |
| Monthly Basis Cab & Taxi Hiring Services - SUV; 1250 x 480 hours; Local | Monthly Basis Cab & Taxi Hiring Services | 1 | ₹ 1560000.000 |
| Monthly Basis Cab & Taxi Hiring Services - SUV; 4500 km x 720 hours; Local 24*7 | Monthly Basis Cab & Taxi Hiring Services | 1 | ₹ 3000000.000 |
| Monthly Basis Cab & Taxi Hiring Services - MUV; 250 km x 260 hours; Local | Monthly Basis Cab & Taxi Hiring Services | 1 | ₹ 840000.000 |
Establishment of hi-tech nandini milk parlour in the premises of rcs office,ali askar road,vasanth nagar, bengaluru
Establishment of hi-tech nandini milk parlour in the premises of rcs office,ali askar road,vasanth nagar, bengaluru.
Read moreManufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage
Manufacture and supply of 600mt of hi-chrome grinding media balls of sizes 50mm and 40mm for ktps-v stage
Read moreEstimation for development of sports arena and beautification of flyover under hi-tech city railway station flyover in madhapur, ward no.107 chandanagar circle 21, slp zone, ghmc.
Estimation for development of sports arena and beautification of flyover under hi-tech city railway station flyover in madhapur, ward no.107 chandanagar circle 21, slp zone, ghmc.
Read moreProviding arrangements for temporary pond at hi tension road,skatingpark(sai baba nagar),machabollarum ward office,panchasheel enclave in ward no 191,machabollarum,alwal circle,malkajgiri zone,mmc(item no.2)
Providing arrangements for temporary pond at hi tension road,skatingpark(sai baba nagar),machabollarum ward office,panchasheel enclave in ward no 191,machabollarum,alwal circle,malkajgiri zone,mmc(item no.2)
Read moreSupply and installation of 1350 (90watt.) and 1500 (120wtat.) led street lights with maintenance for five years in ward of nagar parishad, khagaul
Supply and installation of 1350 (90watt.) and 1500 (120wtat.) led street lights with maintenance for five years in ward of nagar parishad, khagaul
Read moreImprovement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Improvement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreImprovement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Improvement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Read moreProviding necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Providing necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type