Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Preparation Of Detailed Project Report Dpr For Upgradation Of Existing 2 Lane Road To 4 Lane Road Connecting Sector 2325 Diving Road And Leading Towards Nh07
|
| Description |
Consultancy Services For Preparation Of Detailed Project Report Dpr For Upgradation Of Existing 2 Lane Road To 4 Lane Road Connecting
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2024_HRY_405061_1 |
|
Reference Number |
PMDA_2024_5 |
| Tender Fee | 6000 |
| EMD | 50000 |
| Tender Value | - |
| Place | Panchkula |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=481527 |
| Start Date | October 18, 2024 19:30 |
| End Date |
Expired
04/11/2024
Expired 709 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Project management consultancy (pmc) service for nhai - detailed project report (dpr) underground drainage pipeline dgps survey
Project management consultancy (pmc) service for nhai - detailed project report (dpr) underground drainage pipeline dgps survey
Read moreConsultancy services for preparation of feasibility report and detailed project report (dpr) for development of a four lane ring road around the jharia coalfields in the state of jharkhand.
Consultancy services for preparation of feasibility report and detailed project report (dpr) for development of a four lane ring road around the jharia coalfields in the state of jharkhand.
Read moreConsultancy service for reconnaissance survey, detailed survey and investigation, preparation of pre-feasibility report, detailed project report (dpr) and assistance in scrutiny and approval as per sdma guidelines
Consultancy service for reconnaissance survey, detailed survey and investigation, preparation of pre-feasibility report, detailed project report (dpr) and assistance in scrutiny and approval as per sdma guidelines
Read moreDetailed project report (dpr) for establishment of siu_ka_pha university, assam
Detailed project report (dpr) for establishment of siu_ka_pha university, assam
Read moreConsultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the state of himachal pradesh
Consultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the state of himachal pradesh
Read moreConsultancy services for preparation of feasibility report and detailed project report (dpr) for upgradation to 6 lane of ranchi hazaribagh section of nh 33 (from km 41.500 to km 114.000) in the state of jharkhand
Consultancy services for preparation of feasibility report and detailed project report (dpr) for upgradation to 6 lane of ranchi hazaribagh section of nh 33 (from km 41.500 to km 114.000) in the state of jharkhand
Read moreConsultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the ut of jammu and kashmir
Consultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the ut of jammu and kashmir
Read moreConsultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the state of nagaland and tripura.
Consultancy services for carrying out detailed project report (dpr) study for development of ropeway projects in the state of nagaland and tripura.
Read moreConsultancy services for preparation of detailed project report (dpr) of construction of bikaner to kotputli expressway in the state of rajasthan (4th call)
Consultancy services for preparation of detailed project report (dpr) of construction of bikaner to kotputli expressway in the state of rajasthan (4th call)
Read moreConsultancy services for preparation of detailed project report (dpr) and pre-construction activities for widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a.
Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from km. 0.00 to 80.00 ghat to udiyari bend of nh-309a in the state of uttarakhand. (length 80 km).
Read moreof your Industry type