Tender Details

Particulars Details
Title
1/23 24/Bavi A/Tal Barshi/Ghankachra
Description
Constructing Structures For Solid Liquid Waste Management Praposal At Bavi A Tal Barshi Dist Solapur
Organisation Government of Maharashtra
Tender Id 2023_SOLAP_949742_1
Reference
Number
1/23-24/BAVI A/TAL BARSHI/GHANKACHRA
Tender Fee 500
EMD 0
Tender Value -
Place V P BAVI A
Link
View Original Tender Notice

https://mahatenders.gov.in

Start Date October 03, 2023 16:30
End Date
Expired 10/10/2023

Expired 1075 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.

Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.

Read more
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area

Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area

Read more
1) major and minor repairs to tribal girls college hostel (a and b) devarakonda 2) major and minor repairs to tw boys hostel devarakonda 3) major and minor repairs to tw ashram school ups (girls) gazinagar in nalgonda district (package - vii) (reserved for scs communities)

1) major and minor repairs to tribal girls college hostel (a and b) devarakonda 2) major and minor repairs to tw boys hostel devarakonda 3) major and minor repairs to tw ashram school ups (girls) gazinagar in nalgonda district (package - vii) (reserved for scs communities)

Read more
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n

Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.

Read more
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
1/malwandi/ghankachra/23-24

Constructing structures for solid liquid waste management proposal at malvandi tal barshi dist solapur

Read more
2/korfale/ghankachra/23-24

Constructing structures for solid liquid waste management praposal at korfale. tal. barshi dist. solapur

Read more
Ghankachra vyavasthapan gp nagthane tal satara

Ghankachra vyavasthapan gp nagthane tal satara

Read more
Jjm water supply scheme jamgaon a tal barshi

Jjm water supply scheme jamgaon a tal barshi

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise