Tender Details

About Tender

⚡️urgent: Power Restoration At Jalpaiguri Govt. Engineering College⚡️ The Public Works Department Of The State Government, In Response To The Recent Storm That Disrupted Power At Jalpaiguri Government Engineering College, Invites Bids For The Immediate Restoration Of Power Services. 🏫🔧 📅 Bid Submission Deadline: July 12, 2024, 2:00 Pm Bid Security (Emd): Inr 5,50,000 Interested Contractors Must Possess The Necessary Expertise And Resources To Undertake Emergency Restoration Work. Proposals Should Include Detailed Methodologies, Timelines, And Cost Estimates To Ensure Swift And Effective Service Delivery. Keywords: Emergent Restoration, Power Services, Jalpaiguri Government Engineering College, Public Works Department, State Government, Tender, Bid, Emd
Particulars Details
Title
Emergent Restoration Of Power At Jalpaiguri Government Engineering College Due To Storm In The Evening On 31.03.2024.
Description
Emergent Restoration Of Power At Jalpaiguri Government Engineering College Due To Storm In The Evening On 31.03.2024.
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2024_WBPWD_699178_1
Reference
Number
WBPWD/EE/JED/NIQ 04e/Q of 2024-25.
Tender Fee 0
EMD 55000
Tender Value
Place Jalpaiguri Government Engineering College.
Link
View Original Tender Notice

https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1523718

Start Date June 28, 2024 16:00
End Date
Expired 12/07/2024

Expired 705 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of e.i. in nrb at ut chandigarh (replacement of the existing defunct led flood light fittings of existing high mast installed in the cricket stadium in punjab engineering college at sector-12, u.t., chandigarh).

Maintenance of e.i. in nrb at ut chandigarh (replacement of the existing defunct led flood light fittings of existing high mast installed in the cricket stadium in punjab engineering college at sector-12, u.t., chandigarh).

Read more
Restoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.

Restoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.

Read more
Wbpwd/r/ee/s24pgshd/nit-02 of 2026-2027 by ee

Chakberia - bhojerhat road from 4.55 km to 10.69 km, emergent repairing and maintenance work in different stretches under south 24-parganas highway division in the dist of south 24-parganas.

Read more
Reconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode

Reconstruction and repair of major bridge on dhadhar river at km.&#x0d 180/000 to 180/400 on nh-64 in bharuch district in the state of&#x0d gujarat on epc mode

Read more
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.

Read more
Mtc. of e.i in residential building at chandigarh. (providing and replacement of electrical accessories in house no. 1016 and 1024 sector-24, chandigarh). (due to theft).

Mtc. of e.i in residential building at chandigarh. (providing and replacement of electrical accessories in house no. 1016 and 1024 sector-24, chandigarh). (due to theft).

Read more
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode

Read more
Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).

Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the industrial area (phase-1) under the jurisdiction of edd- chandauli pursuant to the bp 2026-27 (on semi turn-key basis).

Read more
Restoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)

Restoration of rain damages on kandu panjoh ( upper) road km. 0/0 to 3/560(sh construction of pcc retaining wall with pusta at rd 0/910 to 0/925)

Read more
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise