Tender Details
Particulars | Details |
---|---|
Title |
Tsk Division Simaluguri Moranhat And Simaluguri Bhojo Formation Treatment. (Total=4.3 Km) In Connection With Simaluguri Jn. New Tinsukia Jn. Dibrugarh (Sl) Tftr 1.000 Tkm
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73539149 |
Reference Number |
02-TSK-ENGG-13-2024 |
Tender Fee | 0 |
EMD | 4.78 Lakh |
Tender Value | |
Place | Guwahati |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73539149/viewNitPdf_4478717.pdf |
Start Date | February 09, 2024 23:34 |
End Date |
01/03/2024 ( Expired 440 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreEngagement of user fee collection agency on the basis of cb through etender for mungwari fp at km 117.400 for 2lane with paved shoulders rehabilitation and strengthening nh86 new nh34 in madhya pradesh
Engagement of user fee collection agency on the basis of cb through etender for mungwari fp at km 117.400 for 2lane with paved shoulders rehabilitation and strengthening nh86 new nh34 in madhya pradesh
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreB.t. renewal of deosar town road length 2.70 km. and supela approach road length 1.00 km. total length 3.70 km. in sub division deosar, distt- singrauli (m.p.)
B.t. renewal of deosar town road length 2.70 km. and supela approach road length 1.00 km. total length 3.70 km. in sub division deosar, distt- singrauli (m.p.)
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreLaying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. 2nd recall
Laying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. 2nd recall
Read moreof your Industry type