Tender Details
Particulars | Details |
---|---|
Title |
Nctps Ii Mi Circle Mpm Iii Ventilation System Unit Ii Ab Row Carry
|
Description |
Nctps Ii Mi Circle Mpm Iii Ventilation System Unit Ii Ab Row Carry
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_534302_1 |
Reference Number |
CE NCTPS II SE M I O M 311 2024 25 |
Tender Fee | 0 |
EMD | 27500 |
Tender Value | |
Place | SE MI NCTPS II |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=636021 |
Start Date | March 21, 2025 20:30 |
End Date |
27/03/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreWork contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreRepair to sewage system in zone-iii and zone-iv area under age b/r-ii of ge (i) kanpur
Repair to sewage system in zone-iii and zone-iv area under 
 age b/r-ii of ge (i) kanpur
Read moreOperation and maintenance of bed ash and fly ash handling system at tnpl unit- ii
Operation and maintenance of bed ash and fly ash handling system at tnpl unit- ii, trichy.
Read moreNctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Nctps i operation circle ca dn dm and ro plant dismantling the existing wornout line fabrication rubber lining and erection of new msrl pipe bend t piece and reducer in pressure sand filter i ii iii iv and v inlet and outlet connecting pipe lines
Read moreMaintenance services to arboriculture assets at environmental test facility (etf) complex strategic weapon system complex (sws) and gun group complex at zone-ii complex, zone-iii to zone viii and cdr building and newly constructed building of high
Maintenance services to arboriculture assets at environmental test facility (etf) complex strategic weapon system complex (sws) and gun group complex at zone-ii complex, zone-iii to zone viii and cdr building and newly constructed building of high
Read moreNctps i se m ii circle ichs dn replacement of existing severely damaged corroded technological structure in conveyor 6a of ichs
Nctps i se m ii circle ichs dn replacement of existing severely damaged corroded technological structure in conveyor 6a of ichs
Read moreNctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Nctps i se m ii ahp dn unit ii overhaul 2025 26 design engineering manufacturing supply erection testing and commissioning of closed type gate hydraulic operated with connected discharge chute for bottom ash hopper work to be carried out in b pass
Read moreNctps i se mi circle boiler maintenance division repair maintenance work for the year 25 26 specification no 30 25 26
Nctps i se mi circle r m 25 26 bm dn aph unit i renewal of existing deteriorated working platform of air pre heater a and b pass at 18 mtr elevation while unit is in service
Read moreof your Industry type