Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Mtps I Bm Unit I Rotating Parts Annual Maintenance 🔧💥 Tneb Limited, A State Government Undertaking, Is Calling For Bids For The Annual Maintenance Of Rotating Parts And The Removal And Renewal Of Insulation In Fg Ducts, Air Ducts, And Air Pre Heaters At Mettur Thermal Power Station I/Mettur Dam. 📅 Bid Submission Deadline: April 24, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 2900 Interested Bidders Should Possess The Necessary Technical Expertise And Experience In Handling Such Maintenance Tasks Within The Power Sector. Detailed Proposals, Including Methodology, Pricing, And Timelines, Are To Be Submitted To Ensure Compliance With The Project Specifications. Keywords: Mtps I, Bm Unit I, Rotating Parts, Annual Maintenance, Tneb Limited, Power Sector, Insulation, Mettur Thermal Power Station I, Mettur Dam, Maintenance Services, Government Tender| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit I Rotating Parts Annual Maintenance 2024 25 Removal And Renewal Of Insulation In Fg Ducts Air Ducts Air Pre Heaters
|
| Description |
Mtps I Bm Unit I Rotating Parts Annual Maintenance 2024 25 Removal And Renewal Of Insulation In Fg Ducts Air Ducts Air Pre Heaters
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_428934_1 |
|
Reference Number |
CE/MTPS-I/SE/M-I/BM/OT.495 / 2023-24 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=510005 |
| Start Date | February 22, 2024 17:30 |
| End Date |
Expired
24/04/2024
Expired 904 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Mtps i bm unit ii boiler pressure parts aoh 2026 erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
Read moreTtps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreRepair/ replacement of unsv parts of ac plants at aftc and unsv duct insulation, underdeck, robotic cleaning of ducts, grill, diffuser and replacement of unsv duct at bhdc under ge (east) delhi cantt-10
Repair/ replacement of unsv parts of ac plants at aftc and unsv duct insulation, underdeck, robotic cleaning of ducts, grill, diffuser and replacement of unsv duct at bhdc under ge (east) delhi cantt-10
Read moreMtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreTtps mech ii bm unit v renewal of worn out cladding sheet plastering insulation from the critical pipe lines repacking of insulation wool plastering cladding at various locations from 8 m level to 54 m level and painting of condensate storage tank ou
Ttps mech ii bm unit v renewal of worn out cladding sheet plastering insulation from the critical pipe lines repacking of insulation wool plastering cladding at various locations from 8 m level to 54 m level and painting of condensate storage tank ou
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreTtpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreof your Industry type