Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Erection Of Top Rollers, Bottom Rollers And Its Brackets In C 4, C 5, C 6 And C 7 Conveyors Of Rls, Bharatpur Ocp For 365 Days For A Period Of 1 Year.
|
| Description |
Dismantling And Erection Of Top Rollers, Bottom Rollers And Its Brackets In C 4, C 5, C 6 And C 7 Conveyors Of Rls, Bharatpur Ocp For 365 Days For A Period Of 1 Year.
|
| Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_MCL_312121_1 |
|
Reference Number |
MCL/BA/EnM/e-Tender/242518 Dated 04.07.2024 |
| Tender Fee | 0 |
| EMD | 29900 |
| Tender Value | |
| Place | BHARATPUR OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323457 |
| Start Date | July 09, 2024 15:30 |
| End Date |
Expired
19/07/2024
Expired 695 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Outsourcing of repair and maintenance of 07 nos. cat777e 100t dumpers, 09 nos. cat777d 100t dumpers and 02 nos. cat777d converted water tankers of khadia project for a period of 01 year (365 days).
Outsourcing of repair and maintenance of 07 nos. cat777e 100t dumpers, 09 nos. cat777d 100t dumpers and 02 nos. cat777d converted water tankers of khadia project for a period of 01 year (365 days).
Read moreEstimate for desiliting of nalas/water logged area (in times of overflow and water logging for rainy season of 2026) in ward no. 1, 2, 3, 4, 5, 6 and 8 in limit of municipal corporation, rohtak. (recall)
Estimate for desiliting of nalas/water logged area (in times of overflow and water logging for rainy season of 2026) in ward no. 1, 2, 3, 4, 5, 6 and 8 in limit of municipal corporation, rohtak. (recall)
Read moreDismantling and erection of rollers, brackets of all the conveyors of the plant for 365 days at new silo, bharatpur ocp as per the instruction of engineer in-charge.
Dismantling and erection of rollers, brackets of all the conveyors of the plant for 365 days at new silo, bharatpur ocp as per the instruction of engineer in-charge.
Read moreDismantling and erection of rollers, brackets of all the conveyors of the plant for a period of 365 days at new silo, bocp.
Dismantling and erection of rollers, brackets of all the conveyors of the plant for a period of 365 days at new silo, bocp.
Read moreFabrication, assembling and fitting of bottom rollers for 1200 mm belt conveyer for the use of c-4, c-5, c-6 and c-7 conveyor at rls plant of bharatpur ocp.
Fabrication, assembling and fitting of bottom rollers for 1200 mm belt conveyer for the use of c-4, c-5, c-6 and c-7 conveyor at rls plant of bharatpur ocp.
Read moreFabrication, assembling and fitting of bottom rollers for 1200 mm belt conveyer for the use of c-4, c-5, c-6 and c-7 conveyor at rls plant of bharatpur ocp.
Fabrication, assembling and fitting of bottom rollers for 1200 mm belt conveyer for the use of c-4, c-5, c-6 and c-7 conveyor at rls plant of bharatpur ocp.
Read moreDismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Dismantling erection of top rollers bottom rollers its brackets in c4 c5 c6 c7 conveyors at rls bocp including its alignment cutting of rope along the conveyor or entangled at any drum of the conveyors for a period of 2 years
Read moreRepairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Repairing of self aligning brackets (top bracket) and (bottom bracket) for conveyors at rls, bocp.
Read moreRepairing and replacing of damaged/ rusted walkway and seal plates of c4, c-5, c-6 and c-7 conveyers at rls, bharatpur ocp.
Repairing and replacing of damaged/ rusted walkway and seal plates of c4, c-5, c-6 and c-7 conveyers at rls, bharatpur ocp.
Read moreErection/ dismantling of pole and conductor on as and when required basis for a period of 1 year (365) days of lt oh line under urimari ocp.
Erection/ dismantling of pole
 and conductor on as and when
 required basis for a period of 1 year (365) days of lt oh line maintenance under urimari ocp.
Read moreof your Industry type