Tender Details
Particulars | Details |
---|---|
Title |
Estimate No 1855/Ngp/2024 25 Providing Shifting Of Electrical Utilities Due To Construction Of Flyover On Umred Butibori Road ( Msh 06) Km 61 00 To 63 00 Between Kanhva To Shirpur Village In R O The Section Engineer ( Electrical ) Public Works Mla
|
Description |
Estimate No 1855/Ngp/2024 25 Providing Shifting Of Electrical Utilities Due To Construction Of Flyover On Umred Butibori Road ( Msh 06) Km 61 00 To 63 00 Between Kanhva To Shirpur Village In R O The Section Engineer ( Electrical ) Public Works Mla
|
Organisation | Public Works Department Mantralaya | State Govt. and UT |
Tender Id | 2025_PWDM_1149222_2 |
Reference Number |
e-Tender Notice No.146/2024-25 |
Tender Fee | 1090 |
EMD | 46600 |
Tender Value | |
Place | Nagpur |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2000178 |
Start Date | February 12, 2025 16:30 |
End Date |
26/02/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane r o b between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac (phase-2) km.177/13-15 distt. saharanpur
Shifting of existing 33 kv, 11 kv, l .t overhead and underground lines due to construct of 2 lane r o b between dm awas to khanalampura yard (star paper mills) at nagal saharanpur road, sampar-84 ac (phase-2) km.177/13-15 distt. saharanpur
Read moreEstimate no 1855/ngp/2024 25 providing shifting of electrical utilities due to construction of flyover on umred butibori road ( msh 06) km 61 00 to 63 00 between kanhva to shirpur village in r o the section engineer ( electrical ) public works mla
Estimate no 1855/ngp/2024 25 providing shifting of electrical utilities due to construction of flyover on umred butibori road ( msh 06) km 61 00 to 63 00 between kanhva to shirpur village in r o the section engineer ( electrical ) public works mla
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from jagtiyal (design km.93.700) to rayapatnam (design km.125.600) (total length 31.900 km) under nh(o) on ham in the state of telangana (pkg-iii)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from jagtiyal (design km.93.700) to rayapatnam (design km.125.600) (total length 31.900 km) under nh(o) on ham in the state of telangana (pkg-iii)
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from medpally (design km. 65.000) to jagtiyal (design km. 93.700) (total length 28.700 km) under nh(o) on ham in the state of telangana (pkg-ii)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from medpally (design km. 65.000) to jagtiyal (design km. 93.700) (total length 28.700 km) under nh(o) on ham in the state of telangana (pkg-ii)
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from armoor (design km. 29.100) to medpally (design km. 65.000) (total length 35.900 km) under nh(o) on ham in the state of telangana (pkg-i)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from armoor (design km. 29.100) to medpally (design km. 65.000) (total length 35.900 km) under nh(o) on ham in the state of telangana (pkg-i)
Read moreConstruction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from rayapatnam (design km. 125.600) to mancherial (design km. 160.995) (total length 35.395 km) under nh(o) on ham in the state of telangana (pkg-iv)
Construction of 4-lane highway of armoor jagtiyal mancherial section of nh-63 from rayapatnam (design km. 125.600) to mancherial (design km. 160.995) (total length 35.395 km) under nh(o) on ham in the state of telangana (pkg-iv)
Read moreShifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Shifting /relocation of existing electrical ss, ht and lt lines due to construction of alternative road from nh-53 to balichandrapur from 0.00 km to 0.480 km by (r and b) under chhatia section
Read moreFour laning section of nh166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719 between kolhapur and sangli in maharashtra to be d on bot (toll) mode under nh(o)
Four laning section of nh166 from chokak to sangli (ankali) km. 145.300 to km. 171.133 and shiroli (sangli phata) to chokak from km. 0.00 to km 7.719 between kolhapur and sangli in maharashtra to be d on bot (toll) mode under nh(o)
Read moreGeneral budget work 2024 2025 2 0 percentage b u d g e t p r o v i s i o n t o w n improvements to vaniyamkulam in between km 38 000 and 39 000 of palakkad ponnani road under shornur lac general civil work
General budget work 2024 2025 2 0 percentage b u d g e t p r o v i s i o n t o w n improvements to vaniyamkulam in between km 38 000 and 39 000 of palakkad ponnani road under shornur lac general civil work
Read moreKyn-kjt:- augmentation of waterway between km 60/000 to 63/800 to avoid flooding of track, by replacing old stone top bridges 60/2, 61/1, 61/2, 62/1, 62/2 & providing additional bridges 60/3, 61/3, 62/1a, and increasing water way of 62/3 along with construction of side drain in abh-bud section & rehabiliation of orn 3 bridge 71/1 under aden(t)kyn.
For complete deion and other details, please refer to tender
Read moreof your Industry type