Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Construction Project At Iit Indore 🌊 The Indian Institute Of Technology Indore, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Construction Of Puddle, Pitching, And Grouting To Mitigate Water Percolation And Soil Erosion At Lake No. 7, Adjacent To The School Building On Its Campus. 📅 Bid Submission Deadline: May 16, 2024, 5:00 Pm The Tender Fee Is Set At Inr 29,500. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, To Address The Environmental Concerns At The Specified Location. Keywords: Construction, Puddle, Pitching, Grouting, Water Percolation, Soil Erosion, Iit Indore, Government Tender, Environmental Protection| Particulars | Details |
|---|---|
| Title |
Construction Of Puddle, Pitching, And Grouting To Avoid The Water Percolation And Soil Erosion Of Lake No 7 Near School Building At Iit Indore.
|
| Description |
Construction Of Puddle, Pitching, And Grouting To Avoid The Water Percolation And Soil Erosion Of Lake No 7 Near School Building At Iit Indore.
|
| Organisation | Indian Institute of Technology Indore | Central Govt. Ministry/Department |
| Tender Id | 2024_IITI_806299_1 |
|
Reference Number |
IITI/IDO/PR/C/L7/NIT-5/24-25/2 |
| Tender Fee | 0 |
| EMD | 29500 |
| Tender Value | - |
| Place | Lake no 7 near school building at IIT Indore |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847471 |
| Start Date | May 10, 2024 14:30 |
| End Date |
Expired
16/05/2024
Expired 843 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of puddle and repairing of spill way to protect leakage of lake no.6 at iit indore
Construction of puddle and repairing of spill way to protect leakage of lake no.6 at iit indore
Read moreIncreasing the depth and finishing of lake no. 3 and 4 at iit indore.
Increasing the depth and finishing of lake no. 3 and 4 at iit indore
Read moreStone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram
Stone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram
Read moreDry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.
Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.
Read moreStrengthening of bund, stone pitching, earth work and necessary civil work of inlet, outlet channel of kanadiya lake, indore (m.p.)
Strengthening of bund, stone pitching, earth work and necessary civil work of inlet, outlet channel of kanadiya lake, indore (m.p.)
Read moreStone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram -2nd call
Stone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram -2nd call
Read moreStone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles
Stone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles
Read moreProviding stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair
Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair
Read moreProviding stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, apwd, sri vijaya puram.
Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, apwd, sri vijaya puram.
Read moreConstruction of cc wall in lake 1 and lake 2 parallel to the road to protect from soil erosion along with footpath and railing at permanent campus, nehu, shillong.
Construction of cc wall in lake 1 and lake 2 parallel to the road to protect from soil erosion along with footpath and railing at permanent campus, nehu, shillong.
Read moreof your Industry type