Tender Details

Particulars Details
Title
Stone Pitching Works For Prevention Of Soil Erosion Adjacent To Transit Building For College Of Horticulture At Thenzawl, Mizoram
Description
Stone Pitching Works For Prevention Of Soil Erosion Adjacent To Transit Building For College Of Horticulture At Thenzawl, Mizoram
Organisation National Projects Construction Corporation Limited | Public Sector Undertakings
Tender Id 2025_NPCC_231080_1
Reference
Number
NPCC/NEZ/GHY/CAU/15
Tender Fee 11800
EMD 1.61 Lakh
Tender Value -
Place THENZAWL, MIZORAM
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=260648

Start Date March 25, 2025 15:30
End Date
Expired 01/04/2025

Expired 562 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.

Execution of stone crate and pitching work to prevent soil erosion along the roadside, caused by flood-induced waterlogging in the existing unlined drain situated beside the arail bandha in naini.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Stone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram -2nd call

Stone pitching works for prevention of soil erosion adjacent to transit building for college of horticulture at thenzawl, mizoram -2nd call

Read more
Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.

Dry stone pitching at side slope of ob dump to protect erosion of soil at dmz view point under rocp.

Read more
Provision of sea erosion prevention wall by stone pitching at eastern side sea shore of otm complex to prevent severe sea erosion at icgs minicoy under ge (navy) lakshadweep

Provision of sea erosion prevention wall by stone pitching at eastern side sea shore of otm complex to prevent severe sea erosion at icgs minicoy under ge (navy) lakshadweep

Read more
Prevention of soil erosion by means of protection wall at khah khul

Prevention of soil erosion by means of protection wall at khah khul

Read more
Prevention of soil erosion by means of protection wall at khah khul

Prevention of soil erosion by means of protection wall at khah khul

Read more
Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair

Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair

Read more
Prevention of soil erosion by means of c/o fpb via crate work,

Prevention of soil erosion by means of c/o fpb via crate work,

Read more
Prevention of soil erosion by means of c/o fpb via crate work,

Prevention of soil erosion by means of c/o fpb via crate work,

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise