Tender Details

Particulars Details
Title
Restoration Work After Road Cutting At Mau Yusufpur Road Ghazipur Turtipar Road Govindpur Mahar Road
Description
Restoration Work After Road Cutting At Mau Yusufpur Road Ghazipur Turtipar Road Govindpur Mahar Road
Organisation Chief Engineer PWD Varanasi Zone | State Govt. and UT
Tender Id 2025_CEUVZ_1075342_1
Reference
Number
2093/10A dt 10-09-2025
Tender Fee 854
EMD 2.75 Lakh
Tender Value -
Place Ghazipur
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1963775

Start Date September 19, 2025 20:30
End Date
Expired 25/09/2025

Expired 383 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Restoration works inside sadar bazar area after laying power cable works laid under the rdss scheme

Restoration works inside sadar bazar area after laying power cable works laid under the rdss scheme

Read more
Restoration works of carripa marg and yadunath marg after laying power cable works laid under the rdss scheme.

Restoration works of carripa marg and yadunath marg after laying power cable works laid under the rdss scheme.

Read more
Restoration works of chappel road and mother teresa road after laying power cable works laid under the rdss scheme

Restoration works of chappel road and mother teresa road after laying power cable works laid under the rdss scheme

Read more
Restoration work of road and bridges during the rain and after rains under the maintance of section amarpatan sub division amarpatan

Restoration work of road and bridges during the rain and after rains under the maintance of section amarpatan sub division amarpatan

Read more
Restoration work of road and bridges during the rain and after rains under the maintance of section ramnagar sub division amarpatan

Restoration work of road and bridges during the rain and after rains under the maintance of section ramnagar sub division amarpatan

Read more
Restoration work after cement concrete on service road from vikas garden to krishna dairy in ward no. 29 under zone no. 07

Restoration work after cement concrete on service road from vikas garden to krishna dairy in ward no. 29 under zone no. 07

Read more
Restoration work of road and bridges during the rain and after rains under the maintance of section rampur baghelan sub division satna

Restoration work of road and bridges during the rain and after rains under the maintance of section rampur baghelan sub division satna

Read more
Custom bid for services - engaging agency for bypass arrangement of 33kv 11kv and lt lines with suitable cables and restoration after completion of stringing work for construction of 765kv dc sirohi rishabdeo transmission line tl01 and tl02

Custom bid for services - engaging agency for bypass arrangement of 33kv 11kv and lt lines with suitable cables and restoration after completion of stringing work for construction of 765kv dc sirohi rishabdeo transmission line tl01 and tl02

Read more
Banana fiber extraction machine,banana pseudo stem cutting machine,hydraulic press juicer for sap liquid,waste fiber recovery machine,10 kl digester with agitator system,storage plastic tank,material transfer trolley,liquid filter,collection tray,sap collection tank rectangular,induction sealer,primary filtration unit after collection tank,banana fiber combing machine,conveyor belt,suture collection tray,banana waste leaves sap extractor,banana fiber drying stand,working tables,fiber shredder machine,banana fiber opening machine,automatic fiber cooker with steam generator,fiber pulper machine,agitator assembly or mixer,balance tank or premixing,paper moulding assembly,hydraulic press machine,paper drying chamber,paper straightening machine,automatic paper cutting machine,office file making machine,preparation tank,hand made paper setup,tools and accessories,plumbing work,electrification and civil work,electric control panel,delivery installation and commissioning

Banana fiber extraction machine,banana pseudo stem cutting machine,hydraulic press juicer for sap liquid,waste fiber recovery machine,10 kl digester with agitator system,storage plastic tank,material transfer trolley,liquid filter,collection tray,sap collection tank rectangular,induction sealer,primary filtration unit after collection tank,banana fiber combing machine,conveyor belt,suture collection tray,banana waste leaves sap extractor,banana fiber drying stand,working tables,fiber shredder machine,banana fiber opening machine,automatic fiber cooker with steam generator,fiber pulper machine,agitator assembly or mixer,balance tank or premixing,paper moulding assembly,hydraulic press machine,paper drying chamber,paper straightening machine,automatic paper cutting machine,office file making machine,preparation tank,hand made paper setup,tools and accessories,plumbing work,electrification and civil work,electric control panel,delivery installation and commissioning

Read more
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Click Here to Download Dockets
of your Industry type