Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rastipur To Babhani Kol Road Link Road (Km 1, 2, 3, 4, 5(550)
|
| Description |
Rastipur To Babhani Kol Road Link Road (Km 1, 2, 3, 4, 5(550)
|
| Organisation | Chief Engineer PWD Azamgarh Zone,Azamgarh | State Govt. and UT |
| Tender Id | 2025_CEUAZ_1006618_3 |
|
Reference Number |
807/NIVIDA(PD MAU)-BALLIA CIRCLE/2025 DATE- 10.02.2025 |
| Tender Fee | 2714 |
| EMD | 5.33 Lakh |
| Tender Value | - |
| Place | MAU |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1802509 |
| Start Date | February 22, 2025 15:30 |
| End Date |
Expired
28/02/2025
Expired 538 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration of rain damages on jgi road km 0/00 to 4/00
Restoration of rain damages on jgi road km 0/00 to 4/00
Read moreRestoration of rain damages on jgi road km 0/00 to 4/00
Restoration of rain damages on jgi road km 0/00 to 4/00
Read moreWard no.-36, jayaprakash nagar road no.-3, (1) drain from gaurav sinha's house to the boundary of harishchandra vidyalaya (2) covered rcc drain construction from priyadarshini bhawan to chhotu yadav's boundary, up to the main road drain gaya ji
Ward no.-36, jayaprakash nagar road no.-3, (1) drain from gaurav sinha's house to the boundary of harishchandra vidyalaya (2) covered rcc drain construction from priyadarshini bhawan to chhotu yadav's boundary, up to the main road drain gaya ji
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read more(1) ward no. 42, in tilha dharamshala locality, azad bhawan lane, from dilip soni's house to azad bhawan and from azad bhawan to bharat mistri (2) tilha dharamshala locality, western lane, from bhola saw's house to sanjay rajak's (main road) house (3) from chandan ji's house to muskan beauty parlour, manoj ji's lane and sumit ji's lane, construction of pcc road and rcc drain. gaya ji
(1) ward no. 42, in tilha dharamshala locality, azad bhawan lane, from dilip soni's house to azad bhawan and from azad bhawan to bharat mistri (2) tilha dharamshala locality, western lane, from bhola saw's house to sanjay rajak's (main road) house (3) from chandan ji's house to muskan beauty parlour, manoj ji's lane and sumit ji's lane, construction of pcc road and rcc drain. gaya ji
Read more(1) drain construction from pappu sinha's house to harinandan prasad's house in mohalla chand chaura under ward no. 42 (2) road and rcc drain construction from shashi prasad's house to jitendra singh's house, sevadal road, champat gali. gaya ji
(1) drain construction from pappu sinha's house to harinandan prasad's house in mohalla chand chaura under ward no. 42 (2) road and rcc drain construction from shashi prasad's house to jitendra singh's house, sevadal road, champat gali. gaya ji
Read moreConstruction of new rcc drain and pcc road from 1. house of reena devi to raghunath chaudhari 2. house of shahab hussain to ali immam in ward no. 15 under nagar parishad gopalganj.
Construction of new rcc drain and pcc road from 1. house of reena devi to raghunath chaudhari 2. house of shahab hussain to ali immam in ward no. 15 under nagar parishad gopalganj.
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreof your Industry type