Tender Details

Particulars Details
Title
Pending Construction Work To Mediation Centre And Ante Rooms In The First Floor Of The Nyaya Seva Sadan Building In The District Court Compound, Guntur
Description
Pending Construction Work To Mediation Centre And Ante Rooms In The First Floor Of The Nyaya Seva Sadan Building In The District Court Compound, Guntur
Organisation Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT
Tender Id 792901
Reference
Number
NIT No.210 / EE / RB / GNT / 2024-25, Dated : 21.03.2025
Tender Fee 197
EMD 5557
Tender Value
Place AP
Link https://tender.apeprocurement.gov.in
Start Date March 25, 2025 20:30
End Date

08/04/2025 ( Expired 91 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26

Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Ancillary work in connection with construction of 50 bedded critical care block g plus 3 at malda medical college and hospital under malda division, pwd in the district of malda.

Ancillary work in connection with construction of 50 bedded critical care block g plus3 at malda medical college and hospital under malda division, pwd in the district of malda.

Read more
Repair to pathways, curve stone, passage, plinth protection, saucer drain, storm drain, compound wall etc and misc b/r nature work in the area of age b/r-ii under ge west delhi cantt-10

Repair to pathways, curve stone, passage, plinth protection, saucer drain, storm drain, compound wall etc and misc b/r nature work in the area of age b/r-ii under ge west delhi cantt-10&#x0d &#x0d

Read more
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor

Read more
Construction of premises boundary wall, construction of rooms and other civil work after maintenance in zonal office no. 19 under zone no. 19

Construction of premises boundary wall, construction of rooms and other civil work after maintenance in zonal office no. 19 under zone no. 19

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.

Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise