Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sp.28 Nctps Ii Es Circle Em Ii Dn Boiler Aux Mtce S Dn I Removal Of Existing 4150 Kw Id Fan Synchronous Motor And Placement Of Spare Id Fan Synchronous Motor Sl No 40157 A425 9101 In 1 A Location During The Aoh Period 2023 In Unit I
|
| Description |
Sp.28 Nctps Ii Es Circle Em Ii Dn Boiler Aux Mtce S Dn I Removal Of Existing 4150 Kw Id Fan Synchronous Motor And Placement Of Spare Id Fan Synchronous Motor Sl No 40157 A425 9101 In 1 A Location During The Aoh Period 2023 In Unit I
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_361217_1 |
|
Reference Number |
SE ES NCTPS II EM-II SPEC NO 28 23 to 24 |
| Tender Fee | 0 |
| EMD | 5300 |
| Tender Value | |
| Place | NCTPS2 |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | August 19, 2023 22:30 |
| End Date |
Expired
01/09/2023
Expired 1011 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Nctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Read moreNctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Nctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Read moreSp.16 nctps ii es circle em ii division boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 1a 1b and 1c at 24 mtr boiler elevation during the aoh period 2024
Sp.16 nctps ii es circle em ii division boiler aux mtce sdni cleaning of cooler and &#x0d heat barrier in bcw pump cum motors 1a 1b and 1c at 24 mtr boiler elevation during the &#x0d aoh period 2024&#x0d
Read moreSp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii
Sp.137 nctps ii es circle em ii dn boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 2a 2b and 2c at 24 mtr boiler elevation during the aoh period 2025 of unit ii
Read moreSp. 108 nctps ii es circle em ii boiler aux mtce sdni replacement of existing 450kw bcw pump cum motor by rewound bcw pump cum motor sl no ap895016 no3 -2 in bcw 2c location during the shutdown period in unit ii through open tender.
Sp. 108 nctps ii es circle em ii boiler aux mtce sdni replacement of existing 450kw bcw pump cum motor by rewound bcw pump cum motor sl no ap895016 no3 -2 in bcw 2c location during the shutdown period in unit ii through open tender.
Read moreSp.79 nctps ii es circle em ii dn boiler aux mtce s dni replacement of defective ht mill motor and lt seal air fan motor lt boiler fil pump motor during the breakdown period in unit i and ii for a period up 31 03 2025 from the taking over of site
Sp.79 nctps ii es circle em ii dn boiler aux mtce s dni replacement of defective ht mill motor and lt seal air fan motor lt boiler fil pump motor during the breakdown period in unit i and ii for a period up 31 03 2025 from the taking over of site
Read moreSp.48 nctps ii es circle em ii dn sdn i boiler aux mtc sdni running maintenance contract estimate for ht lt motors of boiler and mill plant area in unit i and ii for a period of 360 days.
Sp.48 nctps ii es circle em ii dn sdn i boiler aux mtc sdni running maintenance contract estimate for ht lt motors of boiler and mill plant area in unit i and ii for a period of 360 days.
Read moreSp.17 nctps ii es circle em ii division boiler aux mtce s dn i replacement of aged 25nb high pressure cavity filling lines and 25nb low pressure purging lines in bcw motors of unit i and ii at 20 mtr boiler elevation during the aoh period 2025
Sp.17 nctps ii es circle em ii division boiler aux mtce s dn i replacement of aged 25nb high pressure cavity filling lines and 25nb low pressure purging lines in bcw motors of unit i and ii at 20 mtr boiler elevation during the aoh period 2025
Read moreSp.14 nctps ii es circle em ii division boiler aux mtce s dni cleaning of cooler heat barrier and overhauling of values in bcw pump cum motors 2a and 2b at 24 mtr boiler elevation during the aoh period 2024 of unit ii.
Sp.14 nctps ii es circle em ii division boiler aux mtce s dni cleaning of cooler heat barrier and overhauling of values in bcw pump cum motors 2a and 2b at 24 mtr boiler elevation during the aoh period 2024 of unit ii.
Read moreSp.15 nctps ii es circle em ii division sdni charges towards dismembering of de and nde bearings in id fan motors 1a and1b and pa fan motors 1a and 1b and re-fixing after inspection including required
Sp.15 nctps ii es circle em ii division sdni charges towards dismembering of de and nde bearings &#x0d in id fan motors 1a and1b and pa fan motors 1a and 1b and re-fixing after inspection including required &#x0d
Read moreof your Industry type