Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sp.137 Nctps Ii Es Circle Em Ii Dn Boiler Aux Mtce S Dn I Cleaning Of Cooler And Heat Barrier In Bcw Pump Cum Motors 2 A 2 B And 2 C At 24 Mtr Boiler Elevation During The Aoh Period 2025 Of Unit Ii
|
| Description |
Sp.137 Nctps Ii Es Circle Em Ii Dn Boiler Aux Mtce S Dn I Cleaning Of Cooler And Heat Barrier In Bcw Pump Cum Motors 2 A 2 B And 2 C At 24 Mtr Boiler Elevation During The Aoh Period 2025 Of Unit Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_576998_1 |
|
Reference Number |
CE NCTPS II SE ES EM II SPEC NO 137 24 to25 |
| Tender Fee | 0 |
| EMD | 2400 |
| Tender Value | - |
| Place | NCTPS-II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=689535 |
| Start Date | July 02, 2025 23:30 |
| End Date |
Expired
08/07/2025
Expired 460 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sp.16 nctps ii es circle em ii division boiler aux mtce sdni cleaning of cooler and heat barrier in bcw pump cum motors 1a 1b and 1c at 24 mtr boiler elevation during the aoh period 2024
Sp.16 nctps ii es circle em ii division boiler aux mtce sdni cleaning of cooler and &#x0d heat barrier in bcw pump cum motors 1a 1b and 1c at 24 mtr boiler elevation during the &#x0d aoh period 2024&#x0d
Read moreSp.14 nctps ii es circle em ii division boiler aux mtce s dni cleaning of cooler heat barrier and overhauling of values in bcw pump cum motors 2a and 2b at 24 mtr boiler elevation during the aoh period 2024 of unit ii.
Sp.14 nctps ii es circle em ii division boiler aux mtce s dni cleaning of cooler heat barrier and overhauling of values in bcw pump cum motors 2a and 2b at 24 mtr boiler elevation during the aoh period 2024 of unit ii.
Read moreSp. 108 nctps ii es circle em ii boiler aux mtce sdni replacement of existing 450kw bcw pump cum motor by rewound bcw pump cum motor sl no ap895016 no3 -2 in bcw 2c location during the shutdown period in unit ii through open tender.
Sp. 108 nctps ii es circle em ii boiler aux mtce sdni replacement of existing 450kw bcw pump cum motor by rewound bcw pump cum motor sl no ap895016 no3 -2 in bcw 2c location during the shutdown period in unit ii through open tender.
Read moreSp.17 nctps ii es circle em ii division boiler aux mtce s dn i replacement of aged 25nb high pressure cavity filling lines and 25nb low pressure purging lines in bcw motors of unit i and ii at 20 mtr boiler elevation during the aoh period 2025
Sp.17 nctps ii es circle em ii division boiler aux mtce s dn i replacement of aged 25nb high pressure cavity filling lines and 25nb low pressure purging lines in bcw motors of unit i and ii at 20 mtr boiler elevation during the aoh period 2025
Read moreEchp-ii- attending breakdown and prive mechanical maintenance of primary crusher-2a 2b, bfd - 2a 2b, bfd -3a 3b, sfd-1a 1b rc - 2a, 2b, 2c and related equipments in primary crusher house-ii
Echp-ii- attending breakdown and prive mechanical maintenance of primary crusher-2a 2b, bfd - 2a 2b, bfd -3a 3b, sfd-1a 1b rc - 2a, 2b, 2c and related equipments in primary crusher house-ii
Read moreEchp-ii- attending breakdown and prive mechanical maintenance of primary crusher-2a 2b, bfd - 2a 2b, bfd -3a 3b, sfd-1a 1b rc - 2a, 2b, 2c and related equipments in primary crusher house-ii
Echp-ii- attending breakdown and prive mechanical maintenance of primary crusher-2a 2b, bfd - 2a 2b, bfd -3a 3b, sfd-1a 1b rc - 2a, 2b, 2c and related equipments in primary crusher house-ii
Read moreEchpii attending breakdown and prive mechanical maintenance of primary crusher2a 2b, bfd 2a 2b, bfd 3a 3b, sfd1a 1b rc 2a, 2b, 2c and related equipments in primary crusher houseii
Echpii attending breakdown and prive mechanical maintenance of primary crusher2a 2b, bfd 2a 2b, bfd 3a 3b, sfd1a 1b rc 2a, 2b, 2c and related equipments in primary crusher houseii
Read moreSp.141 nctps ii es circle emii division sdni dismembering of de and nde bearing in id fan motors 2a and 2b and pa fan motors 2a and 2b and refixing after inspection including required tps and consumables etc during aoh 2025 of unit ii
Sp.141 nctps ii es circle emii division sdni dismembering of de and nde bearing in id fan motors 2a and 2b and pa fan motors 2a and 2b and refixing after inspection including required tps and consumables etc during aoh 2025 of unit ii
Read moreNctps ii mi circle bm unit ii aoh 2025 26 fd fan 2a 2b
Nctps ii mi circle bm unit ii aoh 2025 26 fd fan 2a 2b
Read moreNctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Nctps-ii es circle em ii dn boiler aux mtce sdni removal of existing 4150kw id fan synchronous motor and placement of spare id fan synchronous motor sl no 40157a425 9101 in 1a location during the aoh period 2023 in unit i
Read moreof your Industry type