Tender Details
Particulars | Details |
---|---|
Title |
Bt Renewal On Jeeran Pirana Road Length 2.80 Km Keri Approach Road Length 2.20 Km In 1/2 To 2/10 Palsoda To Pipliya Vyas Ratadiya Road Lenth 5.51 Km In 1/6 To 3/6 4/6 To 6/8 7/2 To 8/6 Total Renewal Length 10.21 Km
|
Description |
Bt Renewal On Jeeran Pirana Road Length 2.80 Km Keri Approach Road Length 2.20 Km In 1/2 To 2/10 Palsoda To Pipliya Vyas Ratadiya Road Lenth 5.51 Km In 1/6 To 3/6 4/6 To 6/8 7/2 To 8/6 Total Renewal Length 10.21 Km
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10712 |
EMD | 60250 |
Tender Value | |
Place | work |
Link |
AAAAAAAAAA Login to view |
Start Date | May 16, 2025 17:30 |
End Date |
28/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read morePeriodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Read moreRenewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.
Read moreCertain developmental works in cantonment assembly constituency (8 works) drilling of 6 1/2 dia bore wells and laying of vdcc roads under special development funds (sdf) 2023-24
Certain developmental works in cantonment assembly constituency(8works) under sdf 2023-24 drilling o 6 1/2dia borewell at(i.gunbazar ground,rasoolpura ward no:2,ii.lic colony near jnrm,ward no:7,iii.marredpally graveyard,ghmc150 div,iv.shenoy play ground,ghmc150 div,v.silver compund basti b-block,)vi.kakaguda basthiground,nalla pochamma ward no:5,andlaying of vdcc road at (vii. ambedkar sangam galli to police line rasoolpura ward no 2,viii.ammuguda railway station ramakrishnapuram roberts and tirumalgiri main road cantonment assembly constituency
Read moreCertain developmental works in cantonment assembly constituency (8 works) drilling of 6 1/2 dia bore wells and laying of vdcc roads under special development funds (sdf) 2023-24
Certain developmental works in cantonment assembly constituency (8 works) sdf 2023-24 drilling of 6 1/2 dia bore well at (i. teachers colony gun rock park ward no 7, ii. dinakar colony beside masjid ward no. 7, iii . cantonment quarters 2bhk mudfort ward no 7, cantonment ,iv. old gandhi nagar beside church, trimulgherry ward no:7,v. 2 bhk f-block rasoolpura ward no:2, vi. thulukunta amma temple at ammuguda bazar ward no:8 vii. naga devatha templen near cantonment hospital bollaram ward no 8) and laying of vdcc road at (viii. road no1 to road no.4 sardar patel colony trimulgherry ward no: 7,cantonment assembly constituency.
Read moreBt renewal on jeeran pirana road length 2.80 km keri approach road length 2.20 km in 1/2 to 2/10 palsoda to pipliya vyas ratadiya road lenth 5.51 km in 1/6 to 3/6 4/6 to 6/8 7/2 to 8/6 total renewal length 10.21 km
Bt renewal on jeeran pirana road length 2.80 km keri approach road length 2.20 km in 1/2 to 2/10 palsoda to pipliya vyas ratadiya road lenth 5.51 km in 1/6 to 3/6 4/6 to 6/8 7/2 to 8/6 total renewal length 10.21 km
Read moreRequest for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis
Read moreConsultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read more1. construction of kumharikhurd to keregaon road length- 3.20 km 2. construction of umri to borikala b.t. road length - 2.20 km (pole shifting including electric work)
1. construction of kumharikhurd to keregaon road length- 3.20 km&#x0d 2. construction of umri to borikala b.t. road length - 2.20 km (pole shifting including electric work)
Read moreof your Industry type