Tender Details

Particulars Details
Title
Bt Renewal On Jeeran Pirana Road Length 2.80 Km Keri Approach Road Length 2.20 Km In 1/2 To 2/10 Palsoda To Pipliya Vyas Ratadiya Road Lenth 5.51 Km In 1/6 To 3/6 4/6 To 6/8 7/2 To 8/6 Total Renewal Length 10.21 Km
Description
Bt Renewal On Jeeran Pirana Road Length 2.80 Km Keri Approach Road Length 2.20 Km In 1/2 To 2/10 Palsoda To Pipliya Vyas Ratadiya Road Lenth 5.51 Km In 1/6 To 3/6 4/6 To 6/8 7/2 To 8/6 Total Renewal Length 10.21 Km
Organisation PWD- Roads and Bridges | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 10712
EMD 60250
Tender Value
Place work
Link

AAAAAAAAAA

Login to view
Start Date May 16, 2025 17:30
End Date

28/05/2025 ( 9 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km

Read more
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km

Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km

Read more
Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Renewal work by sdbc in vijaynager-pathalidhar motor road from km 2 to 8 augastyamuni block in district rudraprayag under annual repair.

Read more
Certain developmental works in cantonment assembly constituency (8 works) drilling of 6 1/2 dia bore wells and laying of vdcc roads under special development funds (sdf) 2023-24

Certain developmental works in cantonment assembly constituency(8works) under sdf 2023-24 drilling o 6 1/2dia borewell at(i.gunbazar ground,rasoolpura ward no:2,ii.lic colony near jnrm,ward no:7,iii.marredpally graveyard,ghmc150 div,iv.shenoy play ground,ghmc150 div,v.silver compund basti b-block,)vi.kakaguda basthiground,nalla pochamma ward no:5,andlaying of vdcc road at (vii. ambedkar sangam galli to police line rasoolpura ward no 2,viii.ammuguda railway station ramakrishnapuram roberts and tirumalgiri main road cantonment assembly constituency

Read more
Certain developmental works in cantonment assembly constituency (8 works) drilling of 6 1/2 dia bore wells and laying of vdcc roads under special development funds (sdf) 2023-24

Certain developmental works in cantonment assembly constituency (8 works) sdf 2023-24 drilling of 6 1/2 dia bore well at (i. teachers colony gun rock park ward no 7, ii. dinakar colony beside masjid ward no. 7, iii . cantonment quarters 2bhk mudfort ward no 7, cantonment ,iv. old gandhi nagar beside church, trimulgherry ward no:7,v. 2 bhk f-block rasoolpura ward no:2, vi. thulukunta amma temple at ammuguda bazar ward no:8 vii. naga devatha templen near cantonment hospital bollaram ward no 8) and laying of vdcc road at (viii. road no1 to road no.4 sardar patel colony trimulgherry ward no: 7,cantonment assembly constituency.

Read more
Bt renewal on jeeran pirana road length 2.80 km keri approach road length 2.20 km in 1/2 to 2/10 palsoda to pipliya vyas ratadiya road lenth 5.51 km in 1/6 to 3/6 4/6 to 6/8 7/2 to 8/6 total renewal length 10.21 km

Bt renewal on jeeran pirana road length 2.80 km keri approach road length 2.20 km in 1/2 to 2/10 palsoda to pipliya vyas ratadiya road lenth 5.51 km in 1/6 to 3/6 4/6 to 6/8 7/2 to 8/6 total renewal length 10.21 km

Read more
Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis

Request for proposal for-apcrda-social development-outsourcing of sanitation services including solid waste management in 19 grama panchayats (four clusters) covered in crda region (excluding 6 villages merged in mangalagiri -tadepalli municipal corporation) and manual/ mechanized sweeping with 1 no of jatayu vehicle for a road length of 10 km (vvip roads) from 5/2025 to 4/2028 (36 months) on buy/hire, own and operate (boo) basis

Read more
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode

Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode

Read more
1. construction of kumharikhurd to keregaon road length- 3.20 km 2. construction of umri to borikala b.t. road length - 2.20 km (pole shifting including electric work)

1. construction of kumharikhurd to keregaon road length- 3.20 km&amp#x0d 2. construction of umri to borikala b.t. road length - 2.20 km (pole shifting including electric work)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise