Tender Details
Particulars | Details |
---|---|
Title |
Tender For The Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura 2nd Call
|
Description |
Tender For The Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura 2nd Call
|
Organisation | National Projects Construction Corporation Limited | Public Sector Undertakings |
Tender Id | 2025_NPCC_228150_1 |
Reference Number |
NPCC/NEZ/BOP/PKG-M/19 |
Tender Fee | 11800 |
EMD | 48590 |
Tender Value | |
Place | TRIPURA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256319 |
Start Date | February 27, 2025 15:30 |
End Date |
05/03/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreProviding interior work including modular and loose furniture, electrical and allied works, hvac works, fire fighting work and signages for district and session court building, plot no. 2, sector-15 palghar new town, district palghar (2nd call).
Providing interior work including modular and&#x0d loose furniture, electrical and allied works, hvac&#x0d works, fire fighting work and signages for district&#x0d and session court building, plot no. 2, sector-15,&#x0d palghar new town, district palghar (2nd call).
Read moreBalance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong
Balance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong
 
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreRectification work of 1 wss under package-1 to poonjar thekkekara grama panchayath in kottayam district
Rectification work of 1 wss under package-1 to poonjar thekkekara grama panchayath in kottayam district
Read moreRectification work of 1 wss under package-1 to poonjar thekkekara grama panchayath in kottayam district
Rectification work of 1 wss under package-1 to poonjar thekkekara grama panchayath in kottayam district
Read moreDevelopment of distribution infrastructure work for package 18 khanna 1 (doraha div. khanna div.) for execution of ht/lt infrastructure loss reduction works under rdss in the state of punjab
Development of distribution infrastructure work for package 18 khanna 1 (doraha div. khanna div.) for execution of ht/lt infrastructure loss reduction works under rdss in the state of punjab&#x0d
Read moreDevelopment of distribution infrastructure work for package 22 amritsar suburban (including rayya divn.) for execution of ht/lt infrastructure loss reduction works under rdss in the state of punjab.
Development of distribution infrastructure work for package 22 amritsar suburban (including rayya divn.) for execution of ht/lt infrastructure loss reduction works under rdss in the state of punjab.
Read moreof your Industry type