Tender Details

Particulars Details
Title
Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura
Description
Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura
Organisation National Projects Construction Corporation Limited | Public Sector Undertakings
Tender Id 2025_NPCC_226843_1
Reference
Number
NPCC/NEZ/BOP/PKG-M/18
Tender Fee 11800
EMD 48590
Tender Value
Place NORTH TRIPURA
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254472
Start Date February 15, 2025 15:30
End Date

21/02/2025 ( Expired 89 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b

Read more
Laying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16

Laying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16

Read more
Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)

Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)

Read more
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor

Read more
Wbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)

Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.

Read more
Under district lucknow, construction of boundary wall in deen dayal upadhyay state rural development institute, bakshi ka talab in jankipuram extension scheme, sector-10, lucknow lot no 1

Under district lucknow, construction of boundary wall in deen dayal upadhyay state rural development institute, bakshi ka talab in jankipuram extension scheme, sector-10, lucknow lot no 1&amp#x0d

Read more
Balance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong

Balance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong&#x0d &#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise