Tender Details
Particulars | Details |
---|---|
Title |
Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura
|
Description |
Balance Rectification Work Of Bop Package No M (Rw) Sachindrarajapara, Platoon Level Under 33 Bn Under Sector Panisagar In The State Of Tripura
|
Organisation | National Projects Construction Corporation Limited | Public Sector Undertakings |
Tender Id | 2025_NPCC_226843_1 |
Reference Number |
NPCC/NEZ/BOP/PKG-M/18 |
Tender Fee | 11800 |
EMD | 48590 |
Tender Value | |
Place | NORTH TRIPURA |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=254472 |
Start Date | February 15, 2025 15:30 |
End Date |
21/02/2025 ( Expired 89 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreConstruction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b
Construction of 19 m long span rcc t beam bridge over ghudwin khad at km 4785 on hamirpur bhoranj jahu road t04 from km 0000 to km 14000 under pmgsy3 batchi package no hp03168b
Read moreLaying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Laying of paver block and cement concrete work both side of road on removed encroachment place from 60 feet road palhar nagar to ambikapuri in ward no. 14 under zone no. 16
Read moreConstruction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreWbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)
Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.
Read moreUnder district lucknow, construction of boundary wall in deen dayal upadhyay state rural development institute, bakshi ka talab in jankipuram extension scheme, sector-10, lucknow lot no 1
Under district lucknow, construction of boundary wall in deen dayal upadhyay state rural development institute, bakshi ka talab in jankipuram extension scheme, sector-10, lucknow lot no 1&#x0d
Read moreBalance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong
Balance work for c/o kote, magazine and wireless room at bop sinkata of 58 bn (now 1 bn) bsf under shq bsf shillong
 
Read moreof your Industry type