Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Serengda Health Sub Centre Goilkera Block Under West Singhbhum District
|
Description |
Construction Of Serengda Health Sub Centre Goilkera Block Under West Singhbhum District
|
Organisation | Zila Parishad West Singhbhum | State Govt. and UT |
Tender Id | 2025_ZPWSS_102387_1 |
Reference Number |
ZP/CHAIBASA/04/2025-26 GR- 29 |
Tender Fee | 10000 |
EMD | 1.11 Lakh |
Tender Value | |
Place | GOILKERA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=137499 |
Start Date | June 21, 2025 14:30 |
End Date |
28/06/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design construction testing commissioning and operation and maintenance of infrastructure works at integrated manufacturing cluster khurpia uttarakhand
Design construction testing commissioning and operation maintenance of infrastructure works at integrated manufacturing cluster khurpia uttarakhand under amritsar kolkata industrial corridor on epc basis
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreNon comprehenssive biennial rate contract for di dr of epm alternator of under
Non comprehenssive biennial rate contract for di dr of epm alternator of under
 construction boat sm6 and commissioned boats having mdl d448/gds liabilities
 project p75
Read moreConstruction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Construction of fence and road along fence (15.00 km) and approach roads (33.00 km) along indo myanmar border from bp 164 to bp 166 in tirap and changlang district of arunachal pradesh state on epc mode
Read moreCs for supervision of ramnagar bypass of nh 116b in the district of purba medinipur west bengal in epc mode.
Cs for supervision of ramnagar bypass of nh 116b in the district of purba medinipur west bengal in epc mode.
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreCompletion of incomplete works for construction of otm accn for women mps and construction of one rcc covered under ground water sump of 1.10 lakh gallon capacity at fort willam under ge(fw) kolkata
Completion of incomplete works for construction of otm accn for women mps and construction of one rcc covered under ground water sump of 1.10 lakh gallon capacity at fort willam under ge(fw) kolkata
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreof your Industry type