Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction And Commissioning Of 200 Mm Dia Tube Well Including Two Years Defect Liability Period In Block Lohawat
|
| Description |
As Per Td
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_PHCJO_357477_1 |
|
Reference Number |
SE/PHED/Distt. Cr./JU/79/2023-24 |
| Tender Fee | 2000 |
| EMD | 5 Lakh |
| Tender Value | - |
| Place | SE PHED DISTRICT CIRCLE RIKTIYA BHERU JI CIRCLE JO |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | August 10, 2023 16:30 |
| End Date |
Expired
21/08/2023
Expired 1150 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction, commissioning of 150 mm dia single phase tube well on annual rate contract basis in combination strata with 05 years o and m including defect liability period of two years in urban rural area of district deeg.
Construction, commissioning of 150 mm dia single phase tube well on annual rate contract basis in combination strata with 05 years o and m including defect liability period of two years in urban rural area of district deeg.
Read moreConstruction, commissioning of 150 mm dia single phase tube well on annual rate contract basis in sandy strata with 05 years o and m including defect liability period of two years in urban rural area of district deeg.
Construction commissioning of 150 mm dia single phase tube well on annual rate contract basis in sandy strata with 05 years o and m including defect liability period of two years in urbanrural area of district deeg.
Read moreAnnual rate contract for construction and commissioning of 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 2 years in various villages/towns of district bundi
Annual rate contract for construction and commissioning of 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 2 years in various villages/towns of district bundi
Read more200 mm dia existing tube well deepening by dth system beyond existing depth of tube well in sub dn. sanganer
200 mm dia existing tube well deepening by dth system beyond existing depth of tube well in sub dn. sanganer
Read moreNit no. 51/2026-27, annual rate contract work of replacement of submersible/ centrifugal mono block pump set in old tube well and pipe line at wss in district bharatpur including defect liability period of two year.
Annual rate contract work of replacement of submersible/ centrifugal mono block pump set in old tube well and pipe line at wss in district bharatpur including defect liability period of two year.
Read moreDevelopment of integrated manufacturing and logistics clusters at chitrakoot with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Development of integrated manufacturing and logistics clusters at chitrakoot with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Read moreDevelopment of integrated manufacturing and logistics clusters at pratapgarh with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Development of integrated manufacturing and logistics clusters at pratapgarh with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Read moreDevelopment of uttar pradesh defence industrial corridor at chitrakoot with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Development of uttar pradesh defence industrial corridor at chitrakoot with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Read moreDevelopment of integrated manufacturing and logistics clusters at raebareli with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Development of integrated manufacturing and logistics clusters at raebareli with concurrent period of five years for defect liability period and operation and maintenance on epc mode
Read moreAugmentation of urban water supply scheme degana district nagaur under amrut 2.0 including 05 years o and m after 1 year defect liability period
Augmentation of urban water supply scheme degana district nagaur under amrut 2.0 including 05 years o and m after 1 year defect liability period
Read moreof your Industry type