Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Purchase Of Various Size Polythene Begs With Transportation, Loading And Unloading At Nurseries Of Dcf Jalore
|
| Description |
Purchase Of Various Size Polythene Begs With Transportation, Loading And Unloading At Nurseries Of Dcf Jalore
|
| Organisation | Forest - PCCF (HoFF) | State Govt. and UT |
| Tender Id | 2025_FORES_482519_1 |
|
Reference Number |
NIT REF NO 2025-26/5927 DT 23-06-2025 DCF JALORE |
| Tender Fee | 1000 |
| EMD | 29980 |
| Tender Value | - |
| Place | Nurseries OF DCF JALORE |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=861682 |
| Start Date | June 25, 2025 00:00 |
| End Date |
Expired
09/07/2025
Expired 459 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
For hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const.sub division,pstcl., jalandhar.
For hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const. sub division, pstcl., jalandhar.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read morePurchasing of polythene begs with transportation, loading and unloading
Purchasing of polythene begs with transportation, loading and unloading
Read morePurchasing of polythene bags with transportation, loading and unloading
Purchasing of polythene bags with transportation, loading and unloading
Read morePurchase of black polythene bags for plant preparation including transportation, loading and unloading (120 micron)
Purchase of black polythene bags for plant preparation including transportation, loading and unloading (120 micron)
Read moreof your Industry type