Tender Details
Particulars | Details |
---|---|
Title |
Cleaning Of Bastacolla Ocp New Road Weighbridge Of Bastacolla Area For 06 Times And Testing Of 02 No Weighbridge I.E. Bastacolla Ocp And Rajapur Ocp.
|
Description |
Cleaning Of Bastacolla Ocp New Road Weighbridge Of Bastacolla Area For 06 Times And Testing Of 02 No Weighbridge I.E. Bastacolla Ocp And Rajapur Ocp.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1300 |
Tender Value | |
Place | BASTACOLLA AREA |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 14:30 |
End Date |
25/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreSupply, installation, testing, commissioning of hospital laundy equipment on turnkey basis with 02 years comprehensive warranty on buy-back basis and operation of laundry services for a period of 10 years at aiims, new delhi
Tender for supply, installation, testing, and
 commissioning of hospital laundry equipment on
 turnkey basis with 02 years comprehensive
 warranty on buy-back basis and operation of
 laundry services for a period of 10 years at aiims.
Read moreNib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Nib for supply and etc of 132 kv gss 113 rd sbs (distt jaisalmer) alongwith associated line (132 kv d/c parewar 113 rd sbs line (45 km d/c) and 02 no. of 132 kv bay at132 kv gss, parewar
Read moreOverhauling of procon make annunciation system along with contacts cleaning tightening of terminals and reconditioning of panels (associated for alarms and annunciation) in unit no.4 of 2x210mw btps parichha
Overhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of panels (associated for alarms and annunciation) in unit no.4 of 2x210mw btps parichha
Read moreof your Industry type