Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Mnb 28.880 On Digras Darwha Karanja Section In (Km Ch.0.00 To 74.351) Nh361 C Two Lanes With Paved Shoulder In The State Of Maharashtra. (At Risk Cost Of Contractor)
|
Description |
Construction Of Mnb 28.880 On Digras Darwha Karanja Section In (Km Ch.0.00 To 74.351) Nh361 C Two Lanes With Paved Shoulder In The State Of Maharashtra. (At Risk Cost Of Contractor)
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 1.91 Lakh |
Tender Value | |
Place | Digras |
Link |
AAAAAAAAAA Login to view |
Start Date | March 19, 2025 18:30 |
End Date |
01/08/2025 ( 30 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu
Read moreWidening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreWidening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreof your Industry type