Tender Details
About Tender
🏗️ Invitation For Consultancy Services Bid 🏗️ The Department Of Defence Production, Ministry Of Defence, Is Seeking Bids For Consultancy Services To Oversee The Construction Of A Compound Wall In Phase 2 At Beml Plant. 🧱 🗓️ Deadline: May 22, 2024, 4:00 Pm Interested Consultants Should Submit Detailed Proposals, Including Their Qualifications, Experience, And Methodology For The Project. Keywords: Consultancy Services, Construction, Compound Wall, Beml Plant, Ministry Of Defence, Government TenderParticulars | Details |
---|---|
Title |
Custom Bid For Services Consultancy Services For Construction Of Compound Wall Phase 2 At Beml Pa
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id | GEM/2024/B/4936415 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | May 12, 2024 20:56 |
End Date |
22/05/2024 ( Expired 367 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | CHANDRAN DESIGNS CONSULTANTS PRIVATE LIMITED | 16-05-2024 13:20:53 | MSE | MSE | Qualified |
2 | PEMS ENGINEERING CONSULTANTS PRIVATE LIMITED | 21-05-2024 14:21:24 | Registered with designated Agency / Authority | MSE | Qualified |
3 | S G STRUCTURAL ENGINEERS | 18-05-2024 12:12:27 | Registered with designated Agency / Authority | MSE | Qualified |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read morePhase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreIe services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Ie services during onm stage of 4laned divided carriageway from km.175(mh tg border) to km.308(armur)(package nos.ns-2/bot/ap-6,ap-7,ap-8) on nag hyd sec of nh44) in the state of telangana on bot (annuity) basis under ns corr (nhdp phase-ii)
Read moreConsultancy services for preparation of dpr for long term mitigation measures for 17 nos. of blackspot locations on nh 27 in the state of wb
Consultancy services for preparation of dpr for long term mitigation measures for 17 nos. of blackspot locations on nh 27 in the state of wb
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreof your Industry type