Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 30000 Litre Oht At Pudhurlakshmiyapuram Village In Appaneri Panchayat In Kuruvikulkam Panchayat Union Under Mines And Minerals Savings Fund 2023 24
|
Description |
Construction Of 30000 Litre Oht At Pudhurlakshmiyapuram Village In Appaneri Panchayat In Kuruvikulkam Panchayat Union Under Mines And Minerals Savings Fund 2023 24
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_RDTN_362730_1 |
Reference Number |
A3/608/2021 |
Tender Fee | 10000 |
EMD | 10000 |
Tender Value | |
Place | Block Developement Office, Kuruvikulam |
Link | https://tntenders.gov.in |
Start Date | August 24, 2023 20:30 |
End Date |
30/08/2023 ( Expired 656 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of foot over bridges at village godhe wala (ch. 143.180 of nh-05) and village dala (ch. 83.700 of nh-703) in the state of punjab (3rd call)
Construction of foot over bridges at village godhe wala (ch. 143.180 of nh-05) and village dala (ch. 83.700 of nh-703) in the state of punjab (3rd call)
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreConstruction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreConstruction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Construction of kc drain, road protection work and road signage and strengthening by dbm, bc in khatima-melaghat (state road no. 107) under central road and infrastructure fund
Read moreof your Industry type