Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Manufacturing Items Iii Rm.0807
|
Description |
Procurement Of Manufacturing Items Iii
|
Organisation | Cochin Shipyard Limited | Public Sector Undertakings |
Tender Id | 2025_CSL_224198_1 |
Reference Number |
SR3/GePNIC/VKD/ADV003 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Kochi |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=250559 |
Start Date | January 17, 2025 20:30 |
End Date |
27/01/2025 ( Expired 123 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Package iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreImplementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b
Implementation of ngr bypass scheme of 420kv, 63mvar fixed line reactor of each 400kv d/c bongaigaon-balipara-iii and iv line into switchable line reactor at powergrid, 400kv bongaigaon substation under expansion scheme- xxv part-b (neres-xxv part-b)
Read moreDesign, engineering, manufacturing/fabrication, supply, installation, erection, testing commissioning etc. of utility systems, utility piping, fire fighting systems, material handling equipment, electrical, control instrumentation systems
Design, engineering, manufacturing/fabrication, supply, 
 installation, erection, testing commissioning etc. of utility systems, utility 
 piping, fire fighting systems, material handling equipment, electrical, control instrumentation systems
Read moreIehe invites online e-tender for supply of stationary and other items in the institute.
Iehe invites online e-tender for supply of stationary and other items in the institute.
Read moreRate contract for supply of surgical items at aiims deoghar
Rate contract for supply of surgical items at aiims deoghar
Read moreImport substitution of items by indigenous development
Import substitution of items by indigenous development
Read moreof your Industry type