Tender Details
Particulars | Details |
---|---|
Title |
P/R To Sambalpur Sonepur Road (Sh 15) Such As Periodic Renewal Coat Of Sdbc From Ch.35/500 Km To 40/00 Km For The Year 2023 24
|
Description |
P/R To Sambalpur Sonepur Road (Sh 15) Such As Periodic Renewal Coat Of Sdbc From Ch.35/500 Km To 40/00 Km For The Year 2023 24
|
Organisation | Government of Odisha |
Tender Id | 2023_EICCL_94791_2 |
Reference Number |
SE/R AND B/ SNPR / 13 / 2023-24 |
Tender Fee | 10000 |
EMD | 62400 |
Tender Value | |
Place | O/O SE (RandB) Division, Sonepur |
Link | https://tendersodisha.gov.in |
Start Date | September 26, 2023 15:30 |
End Date |
10/10/2023 ( Expired 581 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreA/r m/o narag wasni dinger road km 0/0 to 17/500 and a/r m/o chourighat sarsoo road km 0/0 to 4/0 (sh- p/l patch work in km 0/00 to 1/0 and 10/00 to 14/00 , p/l patch work in km 0/00 to 2/00)
A/r m/o narag wasni dinger road km 0/0 to 17/500 and a/r m/o chourighat sarsoo road km 0/0 to 4/0 (sh- p/l patch work in km 0/00 to 1/0 and 10/00 to 14/00 , p/l patch work in km 0/00 to 2/00)
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Read moreMtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Mtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Read morePeriodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance
Periodical maintenance of pmgsy roads under performance incentive (post dlp) on shiva to gharan road km 0/0 to 10/100 (sh- providing and laying renewal coat using 25 mm thick bituminous concrete surfacing in km 0/0 to 10/100 and five year maintenance
Read moreImprovement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Improvement to road from batagaon to medical square (from ch. 0/500 km to 1/200 km, 1/750 km to 2/00 km, and 2/800 km to 3/200 km) for ensuing car-festival 2025 (such as providing wearing coat with sdbc)
Read moreRenewal work by sdbc at tehari hindolakhal- devprayag vyasghat bilkhet motor road (sh-49) (km 63 to 79) under annual maintenance year 2025 26 pauri constituency
Renewal work by sdbc at tehari hindolakhal- &#x0d devprayag vyasghat bilkhet motor road (sh-49) &#x0d (km 63 to 79) under annual maintenance year 2025&#x0d 26 pauri constituency
Read moreMtc. of road from tingharia to madhya para (l-0.63 km) under pwd(randb) ompi sub-division during the year 2025-26/sh- wbm-iii, carpeting, seal coat, protection work etc.
Mtc. of road from tingharia to madhya para (l-0.63 km) under pwd(randb) ompi sub-division during the year 2025-26/sh- wbm-iii, carpeting, seal coat, protection work etc.
Read moreMtc of road from ompi to raniabari (l- 0.42 km) under pwd (randb) ompi sub-division during the year 2025-26/sh- wbm-iii, re-carpeting, sand seal coat, 2 nos cd, drain work etc
Mtc of road from ompi to raniabari (l- 0.42 km) under pwd (randb) ompi sub-division during the year 2025-26/sh- wbm-iii, re-carpeting, sand seal coat, 2 nos cd, drain work etc
Read moreof your Industry type