Tender Details
Particulars | Details |
---|---|
Title |
C.O Link Road From Kuppa To Palika Sario Km 0.00 To 5.00 Sh F.C 3.5 Mtr Wide Road At Rd1.435 To 1.690 And C.O R.Wall Wall At Rd 1.445 To 1.465
|
Description |
C.O Link Road From Kuppa To Palika Sario Km 0.00 To 5.00 Sh F.C 3.5 Mtr Wide Road At Rd1.435 To 1.690 And C.O R.Wall Wall At Rd 1.445 To 1.465
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_101109_3 |
Reference Number |
11663-70 Dated 03.03.2025 |
Tender Fee | 350 |
EMD | 19700 |
Tender Value | |
Place | Sangla |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=148731 |
Start Date | March 05, 2025 16:30 |
End Date |
12/03/2025 ( Expired 86 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreWidening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRepair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Repair and maintenance of ajanta buldana section of nh 753e from km 0.00 to 49.130 (length 49.130km) in the state of maharashtra (at risk and cost of contractor) (2nd call)
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 1 50 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreof your Industry type