Tender Details
Particulars | Details |
---|---|
Title |
Construction Of A Drain From Mosi Bari To Til Pocher Pond In Pagar Village As Part Of Cd/Csr Activities.
|
Description |
Construction Of A Drain From Mosi Bari To Til Pocher Pond In Pagar Village As Part Of Cd/Csr Activities.
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | NTPC_R3_0000117435 |
Reference Number |
9900294624 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Chatti-Bariatu Coal Mining Pro , Sikri Site Office, P.O. Barka , 825311 , Hazaribag - JHARKHAND , Jharkhand |
Link | http://www.ntpctender.com/ |
Start Date | February 28, 2025 14:30 |
End Date |
28/02/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreConstruction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Construction of balance work in punch lists of ajanta buldhana section of nh753e from km 0.00 to 49.130 in the state of maharashtra on risk and cost of contractor
Read moreRfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.
Read moreConstruction of vup for rectification of blackspot id pb 03 258 of series 2017 to 19 at km 340 plus 260 kotshamir village on nh 148b in the state of punjab
Construction of vup for rectification of blackspot id pb 03 258 of series 2017 to 19 at km 340 plus 260 kotshamir village on nh 148b in the state of punjab
Read moreWidening to 4l ps from design km 67.200 to design km 108.539 of sironcha to atmakur section of nh 353c in the state of telangana on engineering, procurement and construction epc basis
Widening to 4l ps from design km 67.200 to design km 108.539 of sironcha to atmakur section of nh 353c in the state of telangana on engineering, procurement and construction epc basis
Read moreSupervision consultancy services for operation and maintenance of existing two/four lane stretch from km 535.930 (near nasarpore village) to km 714.010 (vapi) section (pkg-6 to pkg-9) of nh-56 in the state of gujarat.
Supervision consultancy services for operation and maintenance of existing two/four lane stretch from km 535.930 (near nasarpore village) to km 714.010 (vapi) section (pkg-6 to pkg-9) of nh-56 in the state of gujarat.
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Read moreof your Industry type