Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr/Mtc. Of Road From Harina Ailmara Road To Nantu Tripura Para (L 2.36km) Under Pwd (R And B) Rupaichari Sub Division During The Year 2024 25/ Sh Construction Of Single Cell Rcc Boxcell, Approach Road, Etc
|
| Description |
Fdr/Mtc. Of Road From Harina Ailmara Road To Nantu Tripura Para (L 2.36km) Under Pwd (R And B) Rupaichari Sub Division During The Year 2024 25/ Sh Construction Of Single Cell Rcc Boxcell, Approach Road, Etc
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_53447_1 |
|
Reference Number |
22(2)/PNIeT/EE/PWD/SBM/24-25 |
| Tender Fee | 4000 |
| EMD | 1.28 Lakh |
| Tender Value | |
| Place | Rupaichari |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=54326 |
| Start Date | September 28, 2024 14:30 |
| End Date |
Expired
03/10/2024
Expired 639 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
A/r and m/o various roads under pwd division south west road-2/sub division-1,2,3,4 and 5 during 2026-27. (sh- emergency response arrangement for water logging through deployment of additional maintenance van and 127 hp pump during monsoon season).
Read moreFdr/mtc. of road from sindukpathar to baishnabpur road via chatakchari (l- 9.70 km) under pwd (r and b) rupaichari sub-division during the year 2024-25/
Sh- construction of rcc boxcell, approach road, mtc. of existing rcc boxcell, wall for protection of road side erosion etc
Read moreFdr/mtc. of road from t02 (harina-ailmara road to jalefa sonai) to ram barua para (l-3.826km)
Sh- construction of toe wall, patch metalling, patch carpeting, seal coat etc. under pwd (randb) rupaichari sub-division during the year 2024-25.
Read moreFdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) sh - construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25
Fdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) sh - construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25
Read moreFdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) / sh- construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25. (2nd call)
Fdr/mtc. of road from rajibnagar to rupaichari via garifa (rpc part) (l- 4.00km) / sh- construction of 2(two) nos rcc boxcell, approach road, wing wall etc. under pwd(r and b) rupaichari sub-division during the year 2024-25. (2nd call)
Read moreFdr/ mtc. of road from harina-ailmara road to nantu tripura para (l-2.36 km)/ sh -dismantling and erection of bailey bridge from bankul - bagmara road (ch.0.200km) to (harina-ailmara road) to nantu tripura para at ch.2.10 km over local cherra.
Fdr/ mtc. of road from harina-ailmara road to nantu tripura para (l-2.36 km)/ sh -dismantling and erection of bailey bridge from bankul - bagmara road (ch.0.200km) to (harina-ailmara road) to nantu tripura para at ch.2.10 km over local cherra.
Read moreFdr/mtc. of road from harina-ailmara road to nantu tripura para (l- 2.36km) and link road of harina- ailmara- east sabroom to natun tripura para nbcc road (l-0.400km) under pwd (r and b) rupaichari sub-division during the year 2024-25/
Sh- cd, protection work, wbm, patch carpeting and seal coat etc
Read moreFdr/mtc. of road from harina-ailmara road to east sabroom (l- 6.410 km) during the year 2024-25
S.h - construction of rcc box cell etc.at ch-0.500 km, at ch.0.55km and at ch.1.00km under rupaichari pwd(randb) sub-division. (gr-1).
Read moreMtc. of pmgsy road from harina ailmara road to sonai jalefa road (t02) (l-10.29km) sh. construction of rcc retaining wall for protection of road side erosion at ch. 7.50 km under pwd (r and b) rupaichari sub-division during the year 2024-25
Mtc. of pmgsy road from harina ailmara road to sonai jalefa road (t02) (l-10.29km) sh. construction of rcc retaining wall for protection of road side erosion at ch. 7.50 km under pwd (r and b) rupaichari sub-division during the year 2024-25
Read moreMtc. of road from harjan para nbcc road to maniram para (l-0.210 km) / sh- sub-grade preparation, gsb, wbm-iii, paver block etc. under pwd (r and b), rupaichari, sub-division during the year 2024-25.
Mtc. of road from harjan para nbcc road to maniram para (l-0.210 km) / sh- sub-grade preparation, gsb, wbm-iii, paver block etc. under pwd (r and b), rupaichari, sub-division during the year 2024-25.
Read moreof your Industry type