Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Cad Cutting The Excess Scarp Material Released From Unit Ii And Iii Main Discharge Header Pipe Of 2374mm Dia M.S Damaged Pipe Line And Also Available Of Scarp Materials In And Around Cooling Water Pump House I Area
|
Description |
Ttps Operation Circle Cad Cutting The Excess Scarp Material Released From Unit Ii And Iii Main Discharge Header Pipe Of 2374mm Dia M.S Damaged Pipe Line And Also Available Of Scarp Materials In And Around Cooling Water Pump House I Area
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_508290_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.253/24-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604593 |
Start Date | December 06, 2024 22:30 |
End Date |
20/12/2024 ( Expired 187 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreTtps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Ttps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Read moreTtps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Ttps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Read moreTtps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Ttps operation circle mpm-ii ac plant renewing of 250 nb spray header pipe of length 12 mtrs in unit iv and v air washer system
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreTtps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Ttps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreTtps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Ttps operation circle cad unit iii cw pump 6.6kv,500 kw jyothi make cw pump motor top bearing oil and water chamber and side air cooler pipes cleaning, and complete cleaning of converging and diverging type fan and fan cover by using soap oil and pai
Read moreTtps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v
Read moreof your Industry type