Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Works Contract For Loading/Unloading And Handling Of Materials At Central Stores/Mettur Edc
|
| Description |
Works Contract For Loading/Unloading And Handling Of Materials At Central Stores/Mettur Edc
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_489016_1 |
|
Reference Number |
SE/MEDC/AEE/MM/MTR/Spec No.024/24-25 |
| Tender Fee | 0 |
| EMD | 23000 |
| Tender Value | - |
| Place | Mettur EDC |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=581098 |
| Start Date | September 30, 2024 22:30 |
| End Date |
Expired
15/10/2024
Expired 726 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreProviding,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreWorks contract for loading and unloading and handling of materials (transporting if necessary ) at central stores in namakkal edc
Works contract for loading and unloading and handling of materials (transporting if necessary ) at central stores in namakkal edc
Read moreDindigul edc - works contract - loading and unloading of materials at central stores dindigul
Dindigul edc - works contract - loading and unloading of materials at central stores dindigul
Read moreAction sale for scrap materials at central stores mettur edc
Action sale for scrap materials at central stores mettur edc
Read more53/24-25 loading,unloading and handling of materials in central stores/paramakudi
53/24-25 ramnad edc loading,unloading and handling of materials in central stores/paramakudi
Read moreWorks contract for loading/unloading and handling of materials at central stores/kedc/ krishnagiri
Works contract for loading/unloading and handling of materials at central stores/kedc/ krishnagiri
Read moreLoading and unloading activity at oc3 stores
Outsourcing of loading and unloading activities by engaging 8 unskilled persons and 1 semi-skilled person per day at ocp3 stores, rg2 area for a period of two years under unit rate system
Read moreEntrusting the day to day works of loading, unloading and handling of materials at stores
Entrusting the day to day works of loading, unloading and handling of materials at stores
Read moreof your Industry type