Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Installation Of Right Side Angular Track Of Y Track Monorail Of Nesco Make Bogie Grit Blasting Plant.?
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106432751 |
|
Reference Number |
35245299 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Jaipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106432751/viewNitPdf_4669387.pdf |
| Start Date | August 05, 2024 22:13 |
| End Date |
Expired
29/08/2024
Expired 781 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Grit blasting of icf and fiat bogie and its components
Grit blasting of icf and fiat bogie and its components
Read moreOperation of coach shot blasting, bogie shot blasting and paint line with paint and shots
Operation of coach shot blasting, bogie shot blasting and paint line with paint and shots
Read moreDistributors for grit blasting unit as per technical specification and drawing attached
Distributors for grit blasting unit as per technical specification and drawing attached
Read moreWhite aluminium oxide 60 mesh for abrasive blasting 99 pure (fused alumina) grit size 60 mesh.
White aluminium oxide 60 mesh for abrasive blasting 99 pure (fused alumina) grit size 60 mesh.
Read moreRepairing, maintenance and operation of pangborn make grit blasting plant for period of 02 years at cmlr jhansi..
Repairing, maintenance and operation of pangborn make grit blasting plant for period of 02 years at cmlr jhansi..
Read moreShot blasting and fluoropolymer (japanese) painting of fiat bogies, bolsters and bogie components for 03 years at lower parel workshop.
Shot blasting and fluoropolymer (japanese) painting of fiat bogies, bolsters and bogie components for 03 years at lower parel workshop.
Read moreFishing right for the section shc(ex) km 42/2 to saraigarh(in) km 93/9-10 both side of track.
Fishing right for the section shc(ex) km 42/2 to saraigarh(in) km 93/9-10 both side of track.
Read moreImprovement work of side track and drain by interlocking tiles from hanuman mandir to telephone exchange in pashupati nagar y block kidwai nagar ward 66 under zone02
Improvement work of side track and drain by interlocking tiles from hanuman mandir to telephone exchange in pashupati nagar y block kidwai nagar ward 66 under zone02
Read moreConstruction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Construction of new bg double line from balodabazar (km 110.500) to parmalkasa (km 280.840) and y-connectivities from lakholi station and marauda y cabin including earthwork, bridges, rail over rail (ror) bridge , road over bridge (rob), road under bridge (rub), station buildings, track works, electrification, signaling &telecommunication works, and allied miscellaneous works in connection with kharsia- naya raipur-parmalkasa 5th & 6th line project under south east central railway in t
Read moreEngineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-
Engineering procurement and construction (epc) for construction of new line work between including earth work, blanketing, minor bridges, major bridges, robs, lhs/rubs, track works, platform work, station building, fobs, other buildings and associated miscellaneous civil engineering works for 25t indian railway standard loading from bikramshila (incl) to katareah (incl) from ch. 0.50 km to 24.274 km with shivnarayanpur to shivnarayanpur y-link from ch. km 1.10 to 2.933 km and katareah y-
Read moreof your Industry type