Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtc Of Various Road I Chirakuti To Goldharpur Panchayet Office Road Ii Kubjhar Masjid Road Iii Baburbazar To Irani Road Sh Protection Of Road Side Berm With C.C Block Pitching, Earth Filling Etc Complete During The Year 2023 24.
|
| Description |
Mtc Of Various Road I Chirakuti To Goldharpur Panchayet Office Road Ii Kubjhar Masjid Road Iii Baburbazar To Irani Road Sh Protection Of Road Side Berm With C.C Block Pitching, Earth Filling Etc Complete During The Year 2023 24.
|
| Organisation | Government of Tripura |
| Tender Id | 2023_CEPWD_39965_1 |
|
Reference Number |
DNIT-33/EE/KLSD/2023-24 |
| Tender Fee | 1000 |
| EMD | 21584 |
| Tender Value | - |
| Place | O/O the Executive Engineer PWD R and B Kailashahar |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in |
| Start Date | July 12, 2023 23:30 |
| End Date |
Expired
27/07/2023
Expired 1178 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreFilling and fancing and earth filling of masjid at gung bulk
Filling and fancing and earth filling of masjid at gung bulk
Read moreEarth filling of graveyard near gousia masjid barthana
Earth filling of graveyard near gousia masjid barthana
Read moreEarth filling near jamia masjid shareef at lalpora a
Earth filling near jamia masjid shareef at lalpora a
Read moreEarth filling of public park near markazi jamia masjid galbugh
Earth filling of public park near markazi jamia masjid galbugh
Read moreCustom bid for services - e tender for supply filling of earth murrum stone pitching work at bpcl
Read more
Construction of brick road with earth filling at natibpur amritala to sk para masjid
Construction of brick road with earth filling at natibpur amritala to sk para masjid
Read moreConstruction of protection wall and earth filling at- jama masjid g.p. rajpuri tal. murud, dist.raigad
Construction of protection wall and earth filling at- jama masjid g.p. rajpuri tal. murud, dist.raigad
Read moreStone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles
Stone pitching and filling with good earth soil in eroded areas along periphery of mansar lake for movment of turtles
Read moreImprovement of road berm/green belt in sector-34, ambala (filling of good earth and grassing in road berm/green belt area and all other works contigent thereto).
Improvement of road berm/green belt in sector-34, ambala (filling of good earth and grassing in road berm/green belt area and all other works contigent thereto).
Read moreof your Industry type